Commit graph

477 commits

Author SHA1 Message Date
igneum-labs
c5bfa14dc0 Counter ASIC 3.0 gates (node): the digests re-read on the right network ids (the digest folds the network id in; the fleet's a15db4f0 on suffix 400 confirmed with the Mac binary of the same fork commit; the publish example 65a42ab2 on the devnet id); the 0.3.13 parse refusal as a cut-order fact
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 18:34:52 +00:00
igneum-labs
ea5e4588e2 Counter ASIC 3.0 gates (node): the rehearsal re-cut for the hour (1 block/s: 600-DAA epochs, window 600, flip at minute 20, floor at minute 40; digest d23394e7...)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 18:18:04 +00:00
igneum-labs
6a57c69580 Counter ASIC 3.0 gates (node): G6 on the signalling fork change GREEN (jobs build-20261006-173017, -174027, -174823: the 2.0 flake re-run alone, the five crates and the app, the relay upload fault noted)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 17:56:11 +00:00
igneum-labs
f35cf492bf Counter ASIC 3.0 gates (node): the signalling gate GREEN (two of three never flips, all three flips at the first full window, nobody flips at the floor; the failed case fails on eight checks), the four summaries, the preconditions rows
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 17:47:31 +00:00
igneum-labs
2439d18c03 Counter ASIC 3.0 gates (node): the two cut preconditions: the fleet rehearsal plan (counter-asic-3-rehearsal.md, the publish and rehearsal override objects with their digests ac8e60ce... and bc2142b1...), the PROPOSED miner-signalled activation (node doc section 6), the fast-time signal gate class-v4-signal.mjs, the signal window in override-60x.json (120) and the README
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 17:27:50 +00:00
igneum-labs
5db68a99ec Counter ASIC 3.0 status: the two cut preconditions (staging rehearsal, miner-signalled activation) as gates; the line for the project lead re-worded, no date until 0.3.14 runs a clean day 2026-10-06 16:47:12 +00:00
igneum-labs
52a3491af0 Counter ASIC 3.0 status: the blocker closed (G4 re-run with the id assertion green), every gate green, the line for the project lead confirmed 2026-10-06 16:45:52 +00:00
igneum-labs
f1938c3357 Merge branch 'ca3-v4-node' into ca3-coord 2026-10-06 16:44:27 +00:00
igneum-labs
78634555f4 Counter ASIC 3.0 gates (node): the program id carries the class: G4 re-run GREEN with the id assertion (every v4 epoch's id = the CLI's class v4 id, differs from the same-seed v3 id; the assertion's failed case fails on that one check), the seven re-exported packs' Metal fingerprints equal the hash lane's table, G5 workers rebuilt from the fix
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 16:43:46 +00:00
igneum-labs
d022e5ef76 Counter ASIC 3.0 status: the hash lane green on the id fix (4366418 merged) 2026-10-06 16:40:09 +00:00
igneum-labs
551198d864 Merge branch 'ca3-v4-hash' into ca3-coord 2026-10-06 16:39:24 +00:00
igneum-labs
43664184ed Counter ASIC 3.0 gates (hash): follow-up 1 on the program-id fix (e05eb0c merged): crate suite 97 of 97, the seven v4 packs re-exported byte-identical (generator 4, id c120d7963abdcd96), fingerprints unchanged on Metal and Apple OpenCL, Mac G2 16 x 1,024 of 1,024 through the v4 class token, the harness 4 of 4 on the class and on the era with the id assert_ne holding; the job scripts take the class token from the pack
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 16:38:48 +00:00
igneum-labs
eef181124f Counter ASIC 3.0 status: the program-id fix merged (e05eb0c), the re-runs open 2026-10-06 16:26:11 +00:00
igneum-labs
329d256202 Counter ASIC 3.0 status: AMD G2 job ready (chain-seed packs, own kit) 2026-10-06 16:22:31 +00:00
igneum-labs
480c0518f6 Counter ASIC 3.0 status: every gate green on the hash, the program-id blocker on the cut, the one line for the project lead 2026-10-06 16:18:08 +00:00
igneum-labs
e029091c3d Merge branch 'ca3-v4-node' into ca3-coord 2026-10-06 16:16:21 +00:00
igneum-labs
3521d9a002 Merge branch 'ca3-v4-hash' into ca3-coord 2026-10-06 16:16:21 +00:00
igneum-labs
d2237cc566 Counter ASIC 3.0 gates (hash): the RTX 5090 G1 and G2 JSON summaries
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 16:15:17 +00:00
igneum-labs
85c267971c Counter ASIC 3.0 gates (hash): the RTX 5090 G1 and G2 evidence from the collected job.log (eight fingerprints equal to the Mac's, 8 x 1,024 of 1,024); hash-gates.md and the bench-log entry closed
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 16:14:08 +00:00
igneum-labs
ed53e96fd8 Counter ASIC 3.0 gates (node): G6 row, the two crates whose lines the relay upload does not carry
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 16:10:30 +00:00
igneum-labs
f0b3355a7a Counter ASIC 3.0 gates (node): G4, G4b, G5 and G6 GREEN for class v4 (the three fast-time summaries incl. the known-failed case, node-gates.md, counter-asic-3-node.md)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 16:10:00 +00:00
igneum-labs
fa857683be Counter ASIC 3.0 gates (hash): the gate directory (hash-gates.md, G1 Mac, G2 Mac, G3 and verifier JSON) and the bench-log entry; the RTX 5090 G1 rows pending the collected job.log
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 16:07:55 +00:00
igneum-labs
179443499d Counter ASIC 3.0 status: job 1 closed (G1 AMD green, the 9070 XT ladder flat to 330,700 ops, watts owed) 2026-10-06 15:58:03 +00:00
igneum-labs
e5e54a681f Counter ASIC 3.0 status: G1 AMD green on the candidate pack (interim, job 1 running) 2026-10-06 15:52:47 +00:00
igneum-labs
2df45c43fb Counter ASIC 3.0 status: the Ember run 5 rows for the 5090 (the cap never binds, 0.41 MH per W flat) 2026-10-06 15:45:39 +00:00
igneum-labs
3c62a8a9c7 Counter ASIC 3.0 status: the PC 1 AMD scripts ready (checks pass, kit verified) 2026-10-06 15:40:42 +00:00
igneum-labs
868c13b393 Counter ASIC 3.0 status: the gate run opened on mx8+sh256x27 (the project lead 16:50 UTC), the gate table 2026-10-06 15:38:44 +00:00
igneum-labs
0962364e03 Counter ASIC 3.0 status: the PC 1 AMD job queue (prepared, not published) 2026-10-06 15:13:22 +00:00
igneum-labs
4bdf9af4c3 Counter ASIC 3.0 status: the close (items 6, 7 and 8 closed; the chip model before and after; the class v4 candidate mx8+sh256x27 ready for the gate run; nine decisions for the project lead; the owed list) 2026-10-06 08:48:18 +00:00
igneum-labs
f4478a8ee1 Merge branch 'ca3-reserve' into ca3-coord 2026-10-06 08:45:48 +00:00
igneum-labs
697b8833df Counter ASIC 3.0 items 6 and 7: the RTX 5090 step-cost rows (PC 2 job run-ca3-family-pc2-20261006, every family bit-exact, mm8 included) in the bench-log and the reserve document 2026-10-06 08:45:02 +00:00
igneum-labs
aab9858068 Merge branch 'ca3-derive' into ca3-coord
# Conflicts:
#	docs/bench-log.md
2026-10-06 08:31:10 +00:00
igneum-labs
c6e03662a6 Counter ASIC 3.0 item 2: the RTX 5090 rows from PC 2 (bit-exact on CUDA, +1.1 s NVRTC per pack, the card-off key finding)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 08:30:15 +00:00
igneum-labs
881ae59779 Counter ASIC 3.0 status: the detector's two calibration findings answered (ba4a995 merged; max r 0.10) 2026-10-06 08:29:28 +00:00
igneum-labs
5b0b08e17f Counter ASIC 3.0 status: PC 2 clear, the detector and vendor-share dry rows on the live tables, the restart constraint 2026-10-06 08:26:52 +00:00
igneum-labs
cb75491b31 Counter ASIC 3.0 status: the marker guard exists in CI already 2026-10-06 08:25:02 +00:00
igneum-labs
7c53b0545a Counter ASIC 3.0 status: items 6 and 7 merged (5090 rows queued), the marker slip recorded 2026-10-06 08:24:50 +00:00
igneum-labs
e3ee3049bd Merge branch 'ca3-reserve' into ca3-coord
# Conflicts:
#	docs/bench-log.md
#	tools/observer/observer.mjs
2026-10-06 08:24:29 +00:00
igneum-labs
3959d66e55 Merge ca3-shadow (item 8's Mac rows) into ca3-coord: LoadClass carries derive_len and shadow; igneum-pow suite 96 passed 2026-10-06 08:11:03 +00:00
igneum-labs
3e77f1adf5 Counter ASIC 3.0 status: the 5090 draws about 290 W at the hash, cap floor 400 W, clocks are the lever (item 8's job) 2026-10-06 07:59:42 +00:00
igneum-labs
1538c78141 Counter ASIC 3.0 status: item 2's verifier headroom table and the crate suite 2026-10-06 07:51:42 +00:00
igneum-labs
36202759eb Merge branch 'ca3-derive' into ca3-coord 2026-10-06 07:51:42 +00:00
igneum-labs
dd08267df3 Counter ASIC 3.0 status: PC 2 clear about 08:35Z, the job order 2026-10-06 07:51:36 +00:00
igneum-labs
f2e79316fe Counter ASIC 3.0 status: item 2 interim (GO as reserve, NO-GO genesis-live at dr736), PC 2 clear about 08:35Z 2026-10-06 07:51:15 +00:00
igneum-labs
5c2131c18e Counter ASIC 3.0 item 2: the verifier headroom per class under the 10 ms gate (the budget item 8 shares)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:51:13 +00:00
igneum-labs
1c08438a12 Merge branch 'ca3-derive' into ca3-coord
# Conflicts:
#	docs/analysis/chip-model-v3.md
2026-10-06 07:51:00 +00:00
igneum-labs
bcc2db992e Counter ASIC 3.0 item 2: the design, the Mac measurements, the chip-model row and the PC 2 job
docs/plans/counter-asic-3-derivation.md (the design, the acceptance test, the interpreter, the allowance argument,
the measurements, the PROPOSED reserve entry R0 for 1.13.2, what is owed), docs/analysis/chip-model-v3.md section 6
(the per-day derivation rows at 1.0x to 3x allowances), the bench-log entry, relay/playbooks/ca3-derive-pc2.ps1
(one PC 2 job: self-fetched packs zip, the installed worker through NVRTC, the card off only under test with its
key from settings.json). Verifier 4.875 / 4.944 ms per unit on one M5 Max core under the measure lock against
x8's 2.061 / 2.063; Metal build 29 ms against 22; hash rate equal; bit-exact on Metal and Apple OpenCL.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:50:01 +00:00
igneum-labs
8f2defa659 Counter ASIC 3.0 status: items 4 and 5 closed, the owed list opened 2026-10-06 07:48:56 +00:00
igneum-labs
ace33b9eef Merge branch 'ca3-detector' into ca3-coord
# Conflicts:
#	docs/plans/funding.md
2026-10-06 07:48:42 +00:00
igneum-labs
6f9b5cf2f5 Counter ASIC 3.0 items 4 and 5: the issuance trigger, the signal trigger, the FPGA lane and the layer 9 against layer 7 ranking
docs/plans/funding.md rule 5: the bounty is escrowed and the benchmark live before daily
issuance crosses USD 20,000 a day, with the price-per-IGN table per halving period.
docs/plans/epoch-length.md section 11: the detector alert held 6 net windows recommends
the next shorter ladder step, per-tier costs at 2,400 and 600, the adversary's share per
compile class. Section 12: HBM FPGA parts with sources, reads in flight per watt against
the RTX 5090 (0.3x to 0.4x at Shuhai's measured rate, up to 1.9x at the unmeasured bank
ceiling), the two FPGA lanes in one table, and the ranking: layer 9 above layer 7.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:47:21 +00:00