Documents only: docs/analysis/class-v6/amd-intel-energy.md and docs/analysis/class-v6/amd-intel-energy/ (the three job scripts, the Level Zero sampler source, the offline-compile prelude and ISA summary).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Documents-only replay of d9e91c5d7 (d9e91c5d7a) for the box mirror master
tools/fleet/box-prover.py point 6: each claimed segment is an eligible job and closes once as paid, expired (unpaid, held_expired) or cancelled (disk, export, cut, chain, timeout, shards, statement, sign, refused), active until then; the row carries outcome, cause, deadline, margin at the claim, seconds spent (wasted unless paid) and the deadline miss; the state carries the counters and the wasted seconds by cause; every close is a RESULT outcome line, the run ends with a RESULT ledger line.
tools/fleet/prover-outcomes.py: the report over state files and logs (a log from before the ledger is reconstructed from its RESULT lines; a state row wins over a log row): outcomes, paid completions (segments, shards, IGN, median end to end, median time to pay, median margin), missed deadlines by cause with the median miss (never negative, none on a stale tip), wasted work by cause, throughput per hour and the paid share of the seconds spent, the open jobs. --self-test to known numbers (known-failed first), run by the gate. tools/fleet/night.py sums the fleet's counters into its hourly row. docs/analysis/proving-outcome-ledger.md: the definitions and how to read the three ratios.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Documents only. The master (292 pages) governs where it differs from the
plan PDF or the RTF; 18 INT gates and 44 R2 closure requirements become
suites INT and REV in the acceptance registry (CI steward).
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
GPU-01, GPU-03 and POW-08 take run_status RUNNING with the evidence rows on build-1 under /srv/artefacts/tas/p02-rows; PASS waits on the AMD cells, the 1080 Ti cell and the re-exported v6 packs.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Documents only. Fourteen findings F01 to F14 with forty-four regressions,
dispatched by lane in dispatch.md; the regressions become suite REV in the
acceptance registry (CI steward).
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
The map gains harness:reference-apps-compat (EVM-02 to EVM-06, partial coverage named per case), harness:reference-apps-ver
(VER-03 to VER-06 and VER-08) and harness:reference-apps-ver-trust-anchor (VER-01 and VER-02, FAIL by design and disclosed).
Batches ra-20261008T1744-evm (22 of 22 rows on the 2.0 devnet, node 4cdcc488) and ra-20261008T1746-ver (evidence per case
under tools/reference-apps/ver/evidence) are recorded with node tools/ci/test-record.mjs --record; the harness map page is
regenerated; the registry rows move with their evidence (site/lc/verify-receipt.js rebuilt in this landing).
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Run 201-ef0f2ed8-2826f37e: node ef0f2ed8 (291ee6ae plus the 2.0.1 version bump) on the key-succession pairing, kaspad check and the five node-side suites green on build-4; the miner cut tip 2826f37e (app crate identical to 2ea7b43f), pow and app green on build-2; evidence at build-1:/srv/artefacts/tas/201-ef0f2ed8-2826f37e/. GOV-01's row takes F0 (docs/plans/igneum-2.0-f0-manifest.md) as its evidence through the batch f0-manifest-20261008-b (the earlier f0 batch landed before the replay existed and never recorded). The map splits the finality cells at the finality lane's ask: harness:finality-sim keeps FIN-08 (the model side), harness:finality-sim-fin02 carries FIN-02's simulator half, node:finality-realnode carries the node lane's real-node lines for FIN-02 and FIN-07.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
docs/plans/igneum-2.0-f0-manifest.md is the fixture F0 every case pins to: the identity pins as the steward read them on 8 October 2026 (the miner cut tip 2ea7b43f, the node roll sha ef0f2ed8, igneum-devnet-4, the object digest be5f4068, the class v5 freeze and its fingerprint, the roles and kits), the four fields main ruled on at 19:3x (P07's workload W as the pilot plan's shape; P00 and P08's fault model and thresholds as the finality spec's own at a1b3977a6; P10's study NOT RUN until unaffiliated participants are recruited, never a staff run; P02's AMD cells the 9070 XT and RX 7600 on PC 1, PARTIAL until a rented AMD cell exists), an unresolved-field register with owners and defaults, and the signing block for 23:30. GOV-01's row (through the batch f0-manifest-20261008, replayed at the merge) adds the manifest to its evidence path and stays RUNNING until the signatures are in.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>