docs/analysis/class-v6/hardware-future.md: one table over PIM and PNM (HBM-PIM, AiM, LPDDR5X-PIM, UPMEM), HBM3E, HBM4 and the custom HBM4E base die, fine-grained DRAM on logic, LPDDR6, 3D DRAM, RLDRAM 3 and Folded Banks, FPGA with HBM2e, wafer-scale, CXL, optical I/O, chiplets and UCIe, and SRAM at N2: energy per dependent read, latency, cost per GB, availability to a non-hyperscaler, the k_read and shadow k bands, the edge per joule at zero shadow against the 5090 and the M5 Max, and the one layer of the four that blunts each with a number. The three findings: a 2 GiB SRAM full store on one N2 reticle is the strongest five-year chip (13x to 17x per joule, about USD 0.3 per MH/s) and no layer reaches it (layer 2 moves its capex, not its joules; the shadow at k = 0.5 holds 4.8x); per-bank PIM is blind (1.6 percent of reads in-bank at 2 GiB) and the custom HBM4E base die is the f = 1 chip with its controller in the stack (6.5x to 14x), untouched by layers 1 to 4; the denominator is the wrong card (the M5 Max at 0.78 microjoules halves to thirds every chip edge). Section 5 carries the k bands for the research lane's chip rows; section 7 the four decisions with defaults and deadlines; section 9 the sources with URLs and dates. tools/ci/export-exclude.txt: docs/analysis/class-v6 is research, not public export.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-08 10:17:50 +00:00

54 KiB

Class v6 research lane B: the hardware future, five years out

Lane B of the class v6 rotating-family research (the founder's word of 8 October 2026, 11:1x UK: "see if anything can be optimised, added or invented"). First cut landed 8 October 2026, 11:5x UK; the full report fills the same file. Every figure carries a label: measured (a number read off an instrument in this repository, with the file), claimed (a vendor's or a paper's number, with the URL and the date read), modelled (arithmetic on claimed figures by the method of docs/analysis/chip-model-v3.md section 5), approximate (from memory or an estimate; the sensitivity is given). Nothing here is a measurement of a chip. Reading public research is in-house; nothing was paid for or asked of anyone outside.

The question, as the coordinator put it: for each memory or packaging line, what does it do to a chip's cost per dependent random read over a dataset of 1 to 8 GiB that grows with chain state (energy per read, latency, capacity cost per GB, availability to a non-hyperscaler), what k band does it give the chip five years out, and which ONE of the four v6 layers (1: per-era parameter draws; 2: the state-sized dataset with a floor; 3: scheduled family epochs; 4: the (c''') acceptance floor and the F8 uniformity test per era) blunts it, with a number. Where a line beats every layer, this file says so with the number.

0. One page

The reads are the hash. Under class v3 the RTX 5090 spends 2.40 microjoules per hash on 128 dependent reads, 18.8 nJ per read all-in, and the memory system itself spends 2.0 nJ of that (chip-model-v3 5.3, modelled); the card's own marginal per dependent DRAM read is 10.9 nJ unlocked and 8.7 nJ at the 1,300 MHz lock (measured 8 October 2026, counter-asic-4-research 15.1a). Every chip in this file is a machine that pays the memory's nanojoule and not the card's ten, plus whatever the shadow (the program work drawn into the memory wait) forces it to pay at k times the GPU's cost per op. That identity does not change with any technology below; what changes is the memory's nanojoule, the rate a chip can read at, what a GB costs, and who can buy it.

The three findings that change v6's design

  1. The strongest five-year chip is not a DRAM chip. It is a 2 GiB SRAM full store on one reticle of merchant N2, and none of the four layers reaches it. TSMC N2 reads 38 Mb/mm^2 of SRAM (claimed, IEEE Spectrum, 12 December 2024, volume in 2025), so 2 GiB is about 452 mm^2 of macro, one die under the 858 mm^2 reticle, roughly USD 400 to 600 of silicon at a USD 30,000 wafer (approximate). It has no activate ceiling, so its rate is power-bound: about 2,100 MH/s at 300 W, 0.14 microjoules per hash, 13x to 17x the 5090 per joule at zero shadow and about USD 0.3 per MH/s against the 5090's 14.7 and the GDDR7 chip's 2.8 (modelled; the wire energy, 0.5 to 2.0 nJ per read, is the sensitivity). Layer 2's floor moves its capex, not its joules: at 4 GiB it is two dies, at 8 GiB four, USD 1,000 to 2,500 of silicon, and its edge per joule falls only from 17x to about 13x because an inter-die hop costs 0.27 nJ (UCIe, claimed 0.5 pJ/bit). A floor that would blunt it on joules (16 to 32 GiB, eight to sixteen reticles) retires every honest card under 32 GB first. The only lever that reaches it is the shadow at k: with the shadow core on the same N2 die the ALU band is 0.3 to 0.8 (the record's), and the class v4 premium holds 4.8x at k = 0.5, 2.7x at k = 1; at the 5090's whole ALU budget (about 330,000 ops per hash, 575 W) 3.7x and 2.0x. The design change: layer 1's program-length draw is sized against this chip, not the GDDR7 board, with its lower bound at the shadow that holds the record's 2.1x today and its upper bound at the honest cards' full latency shadow, re-based every family epoch (layer 3) on the cards then mining; and the public "2x" line is not reachable in this model against this chip at any k under 1. What slows it is money and time (an N2 project, USD 100 M to 500 M and 18 to 24 months, approximate), which is the clock of Counter ASIC 3.0 item 4, not a hash property.

  2. Per-bank processing-in-memory is structurally blind to this hash; the real near-memory threat is the custom HBM4E base die, and layers 1 to 4 do nothing to it. HBM-PIM, AiM, LPDDR5X-PIM and UPMEM put a compute unit beside each bank (or a DPU per 64 MB); a dependent read's next address is uniform over the dataset, so it lands in the same bank with probability bank bytes over dataset bytes: 1.6 percent at 2 GiB on a 32 MB bank, 0.4 percent at 8 GiB, and UPMEM has "no direct communication channel among DPUs" (claimed, the PrIM paper), so the other 98 percent of reads go to the host. The unit that can follow the chain across banks is a controller on the stack's base die, which is exactly what TSMC's custom C-HBM4E is: "the custom base die will integrate memory controllers and PHY" on N3P at 0.75 V, "2x the power efficiency", Micron production 2027, SK hynix HBM4E in 2026 (claimed, TrendForce, 1 December 2025). That is the f = 1 chip of the record with its controller moved into the stack: about 0.9 to 1.0 nJ per read, and HBM4's 32 channels (JEDEC JESD270-4, April 2025) double the activate-bound ceiling per stack, so 6.5x to 14x per joule at zero shadow (the ceiling unmeasured, as the record's HBM rows are). The four layers act on the program, the item map and the capacity; this chip runs any program and holds 36 to 64 GB. What brakes it until about 2028 is availability (HBM allocated to AI, 20 to 26 week leads, Samsung asking USD 4 to 5 per Gbit for HBM4 against 1.5 for HBM3E, October 2026) and the shadow at k: 4.4x at k = 0.5, 2.6x at k = 1.

  3. The denominator is the wrong card. Every chip edge in the record is quoted against the 5090 at 2.40 microjoules. The Apple M5 Max measured 0.78 microjoules per hash at the GPU-plus-DRAM meter (latency-shadow-2026-10-06, 6 October 2026), 3.1x the 5090 per joule, and LPDDR6 SoCs (JEDEC JESD209-6, 2025; 14.4 Gbps, 32-byte atoms) are that tier's next step. Against the M5 Max the GDDR7 chip reads 1.7x, one HBM3 stack 2.4x, the HBM4 base die 3.6x to 4.4x, the N2 SRAM die about 5x, and with the shadow at k = 0.5 the SRAM die reads about 3x. The honest joule, not the 5090's, is the chain's resistance, and the same chips are 2x to 3x less frightening against it. The design change: v6's acceptance floor (layer 4) and the shadow sizing (layer 1) are scored per card tier with the unified-memory SoC tier as the reference joule, the dataset is kept inside 16 GB unified memory (8 GiB at the top of the schedule does that), and the public text states the edge over the best honest joule, which is the number a miner can act on.

The honest line, in one sentence: five years out a 2 to 8 GiB dataset fits in one to four reticles of merchant SRAM at USD 500 to 2,500 of silicon, every DRAM line converges on the same 0.5 to 1.0 nJ per read with its controller in the stack, and no layer of the four touches either; the shadow at the measured k band holds 3x to 5x, the honest tier's own efficiency halves that again, and the clock (project cost against daily issuance) is the wall that is left.

1. The method and the denominators

Quantity Value Label Source
The 5090 at class v3 136.1 MH/s at 326 W, 2.40 microjoules per hash, 17.5 G dependent reads per second, 415 ns at 256 lanes, a 32-byte sector per 4-byte read measured docs/bench-log.md; chip-model-v3 5.1
The 5090 per dependent DRAM read, the whole card's marginal 10.9 nJ unlocked, 8.7 nJ at the 1,300 MHz lock (dram_chase_1g, 18.17 G reads per second) measured, 8 October 2026 counter-asic-4-research 15.1a
The 5090 L2 hit, per dependent read 2.4 nJ unlocked, 1.4 nJ at the lock measured the same
The 5090 per counted ALU op (the class v4 shadow's mix) 11.3 pJ unlocked, 6.2 pJ at the lock (int_arx); the shadow's own 10.4 and 6.5 measured the same; counter-asic-4-research section 1
The 5090 at the 1,300 MHz lock, class v3 134.6 MH/s at 223 W, 1.67 microjoules measured, 7 October 2026 counter-asic-3-status 7c, the clock grid
The class v4 premium F on the 5090 1.10 microjoules unlocked (145 W), 0.65 at the lock (82 to 88 W) measured the same
Apple M5 Max, class v3, GPU plus DRAM channels 27.08 MH/s at 21.0 W, 0.78 microjoules; class v4 at 100,000 ops 1.40 (+16 W); 6.9 pJ per counted op measured, 6 October 2026 (the SoC's other rails and the wall are not in the 21 W) docs/analysis/latency-shadow-2026-10-06.md section 3
RX 9070 XT, class v3 about 18.6 MH/s at about 304 W, 10.6 microjoules; 2.4 G reads per second rate measured, watts approximate docs/analysis/horizon/algorithm.md 5.1
The memory system's own cost per random 32-byte read GDDR7 2.0 nJ, HBM3 1.2 nJ modelled on O'Connor et al. 2017 Tables 2 and 3 and Samsung's pJ per bit roadmap chip-model-v3 5.3
The record's f = 1 chips at zero shadow GDDR7 board 166 MH/s at 77.6 W, 0.466 microjoules, 5.1x; one HBM3 stack 83.6 MH/s at 26.8 W, 0.321, 7.5x; eight stacks 666 MH/s at 174 W, 0.262, 9.2x modelled chip-model-v3 5.4 to 5.6
The chip's k on the shadow's work ALU 0.3 to 0.8; int8 tile 0.03 to 0.3 (the worse lever); L2 hit 0.1 to 0.3; shuffle 0.4 to 0.7 the GPU side measured, the chip side claimed counter-asic-4-research 15.1a

The chip's energy per hash is E = 128 x E_read + P_static / rate + k x F, the rate the smaller of the memory's activate-bound ceiling over 128 and the power budget over the per-hash energy, and the edge is the card's microjoules over the chip's. Two k columns appear below: k_read, the memory's energy per dependent read over the 5090's measured 10.9 nJ (what the technology itself buys, independent of any program), and the shadow k band, the chip's cost per forced op over the GPU's, which no memory technology changes (it is a logic-node question: a chip core at N2 against a GPU at N3 or N4 sits at the band's low end, 0.3; at the same node, 0.5 to 0.8; approximate).

Reads are counted at the part's atom: 32 bytes on GDDR7, HBM3, HBM4 and LPDDR6 (each gives a 32-byte minimum access; JEDEC, claimed), 64 bytes on an SRAM macro or a line-based part. The class v6 read-width draw (4 to 64 bytes per read under layer 1) does not move any row: a chip's controller fetches the atom whatever the hash asks for, as the 5090 fetches its 32-byte sector for a 4-byte load, and the record's w64 reading (the 5090 bandwidth-bound at 71.9 MH/s, chip-model-v3 5.7) says a wider honest read costs the card and gives the chip nothing. The dataset's size enters only through capacity cost and die count; its growth (layer 2) enters through the number of dies or stacks a chip must carry at each family epoch.

2. The table

Energy is per dependent random read at the part's atom. Latency is the read's own (controller to data), not the GPU's queueing. Cost per GB is factory-gate where a source gives it, with contract pricing about 2x (Silicon Analysts, October 2026). "Edge" is per joule against the 5090 at class v3 and zero shadow; the bracket is against the M5 Max's 0.78. "Year" is when a non-hyperscaler could put the part on a board. Every chip-side figure is modelled unless labelled.

Technology Year Energy per dependent read Latency Cost per GB Availability to a non-hyperscaler k_read (over 10.9 nJ) Edge at zero shadow, per joule The layer that blunts it, and by how much
GDDR7 on a PCB, 16 devices, a 28 nm controller (the record's f = 1 chip) now 2.0 nJ (modelled); 4.5 pJ per bit streaming (claimed, Micron) about 55 ns controller, tRC about 45 ns USD 10 (2 GB parts, ending) to 20 to 23 (3 GB parts at USD 60 to 70), September 2026 (claimed, TrendForce) anyone, through distribution; the 2026 DRAM price cycle (LTAs USD 7.8 to 21 per GB, May 2026, claimed) roughly triples the chip's memory bill against 2025 0.18 5.1x (1.7x); 166 MH/s at 78 W none of the four; the shadow at k = 1 holds 2.1x (the record); the dataset's size does not matter because the chip over-provisions capacity for channels (16 devices whatever the dataset)
GDDR7 at 36 to 48 Gbps, 4 and 6 GB devices 2027 to 2028 (claimed, Micron roadmap via Guru3D and OC3D) the same 2.0 nJ: the activate ceiling and the row energy do not move with the pin rate the same per-GB falls, per-channel rises: a random-read chip buys channels, not bytes anyone 0.18 5.1x none; denser devices HURT the chip (fewer channels per GB), so this line goes the chain's way
HBM3E, one stack, a 28 nm controller on a one-stack interposer now 1.2 nJ (modelled); 4.05 pJ per bit streaming (claimed, Samsung) about 50 ns USD 8.3 factory gate (USD 300 per 36 GB), about 2x on contract (claimed, Silicon Analysts, October 2026); plus about USD 200 of interposer Tier-1 volume pricing, 20 to 26 week leads, "supply constrained through 2026" (claimed); a one-stack buyer pays broker prices 0.11 7.5x (2.4x); 84 MH/s at 27 W (ceiling unmeasured, 10.7 G reads per second; 2.3 G at the JEDEC tFAW, which would read 1.8x) none; the shadow at k = 1 holds 2.4x (the record)
HBM4 (JESD270-4, April 2025): 2,048-bit, 32 channels x 2 pseudo-channels, 8 Gbps, 2 TB/s, 36 to 64 GB, VDDQ 0.7 to 0.9 V, a TSMC N12 base die at 0.8 V "1.5x efficiency" (claimed) 2027 to 2028 for a non-hyperscaler 1.0 to 1.1 nJ (modelled: the I/O term at 0.8 V against 1.1 V, the 909 pJ row activation unchanged) about 50 ns USD 15.3 (USD 550 per 36 GB, October 2026 estimate); Samsung asking USD 4 to 5 per Gbit for 2027 (USD 32 to 40 per GB) (claimed) allocated to AI accelerators through 2027; "mid-to-high $4 per gigabit" in this month's negotiations (claimed, 2 October 2026) 0.10 4.5x to 11x (1.5x to 3.6x): the 32 channels double the activate-bound ceiling per stack if tFAW is per channel (unmeasured) none of the four; the shadow at k = 0.5 holds 4.4x, at k = 1 2.6x
Custom HBM4E base die (C-HBM4E): the controller and PHY in the stack on N3P at 0.75 V, "2x the power efficiency" (claimed, TrendForce, 1 December 2025); Micron 2027, SK hynix 2026 2028 or later for a non-hyperscaler 0.9 to 1.0 nJ (modelled: no interposer crossing for the controller's traffic) about 45 ns HBM4E class, USD 20 to 40, plus a custom base die (USD 50 to 100 per stack, approximate) by design a per-customer product of the three DRAM makers; the named customers are NVIDIA and Google; a miner-maker of Bitmain's size could commission one (approximate) 0.09 6.5x to 14x (2.1x to 4.4x) beats all four layers; the shadow at k = 0.5 holds 4.4x, at k = 1 2.6x; the shadow core sits on the same N3P base die
Fine-grained, hybrid-bonded DRAM on logic (FGDRAM-class 256-byte rows, "tFAW effectively eliminated", 51 percent lower energy per access, 4x bandwidth, claimed, O'Connor et al., MICRO 2017; hybrid-bonded stacks and 3D DRAM on the 2028 to 2030 roadmaps, approximate) 2029 to 2031 0.5 to 0.7 nJ (modelled: 230 pJ activation for a 256-byte row plus about 1.2 pJ per bit of movement over bonded pads) about 40 ns HBM class, USD 15 to 40 (approximate) custom, the three DRAM makers, top customers first 0.05 12x to 20x (4x to 6x); about 125 MH/s per stack at 19 W, 1,000 MH/s at 150 W for eight beats all four layers; the shadow at k = 0.5 holds 5.1x, at k = 1 2.8x
Per-bank PIM: Samsung HBM-PIM (a PCU per bank, 2021), SK hynix GDDR6-AiM (16 Gbps, 1.25 V, 2022) and AiMX (32 GB card), Samsung LPDDR5X-PIM (Hot Chips, 25 August 2026, 614 GB/s internal) and LPDDR6-PIM (JEDEC work "substantial progress") now to 2027 the host memory's own: 1.8 nJ (HBM2), 2.0 (GDDR6 class); the PIM unit never sees the read it would need the same the host part's plus a premium HBM-PIM and AiM were samples and prototypes; LPDDR5X-PIM mass production "as early as 2027" (claimed) n/a: no path for a cross-bank dependent read none beyond the base-die row: the unit serves 1.6 percent of reads at 2 GiB (a 32 MB bank), 0.4 percent at 8 GiB layer 2, trivially: any dataset over a bank; the number is bank bytes over dataset bytes
UPMEM DPU-in-DRAM: 128 DPUs per 8 GB DIMM, 64 MB MRAM per DPU, 350 MHz, MRAM by DMA at most 628 MB/s per DPU, "no direct communication channel among DPUs" (claimed, the PrIM paper, 2021); 1.2 W per 4 Gb chip, 10x DRAM's price at sampling, 1.5x projected (claimed, The Next Platform, 2020) now about 0.3 microseconds per 64-byte DMA at 350 MHz (approximate from the paper's alpha-plus-beta model); 2 GiB spans 32 DPUs and every cross-DPU hop is a host round trip of microseconds microseconds 1.5x to 10x DDR4 anyone, in server DIMMs n/a none: dead at any dataset over 64 MB layer 2's floor alone (2 GiB = 32 DPUs with no path between them)
LPDDR6 (JESD209-6, 2025): 24-bit channels as two 12-bit sub-channels, 32-byte minimum access, 10.7 to 14.4 Gbps, 4 to 64 Gb dies (claimed, JEDEC via PCWorld and HotHardware) 2026 to 2028 1.5 to 2.0 nJ (approximate: short rows, low-voltage I/O over a PCB, 16 to 32 banks per channel) about 60 ns USD 8 to 21 in the 2026 cycle (LTAs, claimed); about USD 3 to 4 in 2024 (approximate) anyone; it is also the honest SoC tier's memory 0.15 to 0.18 about 4x to 5x for a 32-channel controller chip (1.3x to 1.6x against the M5 Max, which already IS this part with a GPU) none needed: the honest tier converges on it; see finding 3
3D DRAM (Samsung VS-DRAM 16 layers, VCT 4F2; Neo 3D X-DRAM 230 layers; SK hynix and Micron stacked cells), "from 2030" (claimed, heise, 29 May 2024) 2030 or later no vendor claims a latency or activate change; the row energy class is the planar part's (approximate) the same lower per GB after 2030 the three makers 0.1 to 0.2 the DRAM rows above none needed inside five years; it lowers the chip's and the card's capacity cost alike
RLDRAM 3 (Micron, 2011): tRC under 10 ns, 16 banks, no activate command, "SRAM-like random access" (claimed, Micron); 576 Mb and 1.125 Gb devices at 2,133 Mb/s (approximate) now, in small volume 2 to 4 nJ (approximate: a full small-row access per read; no energy figure found, the datasheet's power calculator exists) under 10 ns USD 400 to 800 (USD 50 to 100 per 1.125 Gb device, approximate, a networking part) anyone, catalogue 0.2 to 0.4 about 2 G random reads per second PER DEVICE (16 banks over 8 ns), 32 G for 16 devices: 250 MH/s per board, about 5x per joule (approximate) layer 2: USD 3,000 to 6,000 of memory at 8 GiB; the line to watch is AMD's "Folded Banks" (ISCA 2025): 8x the activate parallelism in HBM gives 6.7x the irregular bandwidth (claimed, the abstract)
FPGA with HBM2e: AMD Alveo V80 (Versal XCV80, 32 GB, 820 GB/s, 190 W, USD 9,495 MSRP, May 2024, claimed), Versal HBM VH1782, Altera Agilex 7 M (two HBM2e stacks, 820 GB/s), Alveo U55C USD 4,747 now HBM2 class, 1.8 nJ, but the fabric's controller reaches only the JEDEC tFAW ceiling: 2.3 to 2.4 G reads per second per stack (Shuhai, FCCM 2020; the record) about 100 ns USD 300 per GB of card anyone, 10 to 24 week leads 0.17 0.6x (0.2x): 4.8 G reads per second for two stacks, about 37 MH/s at 150 W, at 5x the 5090's price none needed; no HBM3E FPGA was found announced (unverified)
Wafer-scale SRAM: Cerebras WSE-3, 44 GB SRAM, 21 PB/s, 900,000 cores, 46,225 mm^2 on N5 (claimed, Cerebras and The Next Platform, March 2024); CS-3 about 23 kW and "maybe $2.5 million" (claimed, approximate) now, by the system about 7 nJ (approximate): a 512-bit reply crossing about 140 mm of mesh on average at about 0.1 pJ per bit per mm about 0.5 microseconds across the wafer USD 50,000 per GB by the system only 0.6 0.1x to 0.4x: a uniformly random dependent chain is bisection-bound on a 2D mesh (about 110 G reads per second per wafer, up to 500 G with the dataset replicated twenty times), 5 to 22 M reads per second per watt against the 5090's 54 M; 1/1,000 per dollar none needed; layer 2 removes the replicas as the dataset grows
CXL memory pools (CXL 2.0 and 3.x; about 70 ns of controller on top of local DDR5, 100 to 160 ns on Xeon 6 against 75 local, claimed, Introl, February 2026; USD 4 to 7 per GB before the 2026 cycle) now DDR5's 2 to 3 nJ plus the link 170 to 250 ns through a host USD 4 to 21 anyone 0.2 to 0.3 0.4x: 500 M 64-byte transactions per second per x8 device at about 25 W (approximate) none needed; a capacity tool, not a random-read engine
Optical I/O: Ayar Labs TeraPHY (UCIe-compliant, about 5 pJ per bit, USD 500 M raised 3 March 2026, claimed); Celestial AI Photonic Fabric (6.2 pJ per bit, about 120 ns round trip, claimed) 2027 or later 6x to 8x the interposer's 0.8 pJ per bit per bit moved plus 120 ns n/a n/a worse than copper for this traffic no edge: a pooling fabric; the dependent chain wants the memory closer, not farther none needed
Chiplets and die-to-die: UCIe 0.25 to 0.5 pJ per bit (claimed, UCIe via SNIA); BoW 0.5 to 0.7; CoWoS-S USD 600 to 900 per H100-class package, a one-stack interposer about USD 200 (the record) now adds 0.27 nJ per 544-bit read that crosses a die boundary plus 5 to 10 ns per hop the package: USD 100 to 200 organic with UCIe-S, USD 200 to 900 for 2.5D UCIe IP from several vendors; CoWoS capacity booked by AI through 2027 (approximate) n/a moves the SRAM chip's multi-die rows (below) and lets a 28 nm controller sit beside memory on an organic package none needed
SRAM scaling at 2 nm: TSMC N2 38 Mb/mm^2 HD, +11 percent over N3E (claimed, IEEE Spectrum, 12 December 2024); wafers about USD 30,000, booked to 2028 (claimed, 2026) now (N2 in volume from 2025) 1.0 nJ for a 64-byte read from a 452 mm^2 array (approximate; 0.5 to 2.0: the global wire at about 1.3 pJ per bit across a 24 mm die is the term) 10 to 20 ns USD 200 to 300 per GB of silicon (one 600 mm^2 die, about USD 400 to 600, holds 2 GiB) N2 is a merchant node: any customer with a project (Apple, AMD, NVIDIA, MediaTek, Qualcomm; the Bitcoin chip makers are on N3 and N4 class already, approximate) 0.09 13x to 17x (4x to 5x): no activate ceiling, power-bound at about 2,100 MH/s per die at 300 W, USD 0.3 per MH/s of silicon; two dies at 4 GiB and four at 8 GiB cost USD 1,000 to 2,500 and read about 13x beats layers 1, 3 and 4; layer 2 cuts its capex, not its joules: one reticle at 2 GiB, two at 4 GiB, four at 8 GiB; the shadow at k = 0.5 holds 4.8x, at k = 1 2.7x; on the M5 Max's joule about 3x at k = 0.5

Density against the schedule: SRAM gains 6 to 11 percent per node every two to three years (N3E +6, N2 +11, claimed), the dataset doubles every four years (spec 1.13.3: 2 GiB at genesis, 4 GiB at year 4). The SRAM chip loses that race slowly: its die count doubles each doubling and its per-read energy rises 0.1 to 0.3 nJ per extra hop. It does not lose it inside five years.

3. What each line does to the four layers, read the other way

Layer What it does to the lines above Number
1. Per-era draws (mixer rounds, op-mix weights, read width, program length, shadow placement) The read width and the mixer draws move no chip row: every chip in the table stores the dataset and reads the atom. The program length IS the shadow, and it is the only draw that reaches the memory-system chips at F = 1.10 microjoules (class v4) the strongest DRAM chip reads 2.6x to 2.8x at k = 1 and 4.4x to 5.1x at k = 0.5; at the full 5090 shadow (F about 2.0) 2.0x and 3.7x
2. The state-sized dataset with a floor Kills per-bank PIM and UPMEM outright; raises the SRAM chip's die count and capex; does nothing to any DRAM chip, which carries 24 to 64 GB per stack and over-provisions capacity for channels anyway PIM serves 1.6 percent of reads at 2 GiB, 0.4 at 8; the SRAM chip's silicon USD 500 at 2 GiB, 1,000 at 4, 2,500 at 8, its joules 17x to 13x
3. Scheduled family epochs every 180 days None of the chips in the table is fixed-function; the controller chip runs any program and the SRAM chip's shadow core is a sequencer 0
4. The (c''') floor and the F8 uniformity test per era Keeps the hot-set cache at the record's 1.067x ceiling; the L2 hit at 2.4 nJ on the 5090 against 0.2 to 0.5 on a chip means the uniformity test is what stops a small cache from being the chip's edge 1.067x at the ceiling (the record)
A fifth: the denominator The honest tier's own operating point is the resistance: the 5090 at the lock reads 1.67 microjoules, the M5 Max 0.78; every chip edge halves to thirds against them the SRAM die 5x and the base die 3.6x to 4.4x against the M5 Max at zero shadow; about 3x with the shadow at k = 0.5

4. The lines in detail

4.1 Processing-in-memory and processing-near-memory

Samsung's HBM-PIM (Aquabolt-XL, February 2021) places a programmable computing unit inside each bank of an HBM2 stack and reports 2.5x system performance and over 60 percent energy saved on a Xilinx Alveo host (claimed, Samsung, 24 August 2021). SK hynix's GDDR6-AiM (February 2022) adds compute to a 16 Gbps GDDR6 die at 1.25 V, claims up to 16x on some AI operations and 80 percent less power, and the AiMX card (2023) carries 32 GB of it (claimed, SK hynix). Samsung's LPDDR5X-PIM (Hot Chips, 25 August 2026) reaches 614 GB/s inside the package against 76.8 GB/s over the external interface at LPDDR5X-9600, 3x the tokens per second on Llama 3.1 8B, with mass production "as early as 2027" and LPDDR6-PIM in JEDEC work (claimed, TrendForce and Sammyfans, 25 to 26 August 2026). UPMEM's DPU-in-DRAM ships: 128 DPUs per 8 GB DIMM, 64 MB per DPU, 350 MHz, MRAM reached only by DMA with a fixed cost plus a per-byte cost and at most 628 MB/s per DPU for 2,048-byte transfers, and "there is no direct communication channel among DPUs" (claimed, the PrIM characterisation paper, arXiv 2105.03814, read 8 October 2026). The academic line (IMPICA, ICCD 2016: a pointer-chasing engine on a 3D stack's logic layer, 1.2x to 1.9x and 10 to 41 percent less energy on linked lists, hash tables and B-trees, claimed) puts the chaser on the base die, not in the bank, for the same reason this hash defeats the bank units: the next address is anywhere.

What it does to the chip's cost per dependent read: nothing good for the attacker at the bank level. The PIM unit's arithmetic is the wrong kind (FP16 SIMD, not 32-bit integer ARX) and the wrong place: with uniform addresses the chain leaves the bank after one read with probability 1 minus bank bytes over dataset bytes (98.4 percent at 2 GiB on a 32 MB bank), and in UPMEM's case leaves the DPU with no path but the host. The near-memory version (a chaser with its own controller on the base die) is the record's f = 1 chip, and that is where PNM becomes real: see 4.2.

Blunted by: layer 2, by the dataset's size alone. k: none (no path).

4.2 HBM3E, HBM4 and the custom base die

JEDEC's JESD270-4 (16 April 2025; read via eeNews Europe, 18 April 2025, and the search summaries, the Business Wire and All About Circuits pages refusing the fetch) doubles the channel count to 32 with two pseudo-channels each on a 2,048-bit interface at up to 8 Gbps, 2 TB/s per stack, 4 to 16-high stacks of 24 or 32 Gbit dies up to 64 GB, VDDQ 0.7 to 0.9 V and VDDC 1.0 to 1.05 V (claimed). TSMC builds the standard HBM4 base die on N12 at 0.8 V for "roughly 1.5x" efficiency and the custom C-HBM4E base die on N3P at 0.75 V for "2x the power efficiency of today's DRAM manufacturing", and "the custom base die will integrate memory controllers and PHY components typically housed separately"; Micron targets 2027 production, SK hynix a first tailored HBM4E in the second half of 2026 with 12 nm for mainstream and 3 nm for NVIDIA and Google premium designs, Samsung 4 nm now and 2 nm for custom HBM (claimed, TrendForce, 1 December 2025 and 23 January 2026). Prices: HBM2e USD 120 per 16 GB, HBM3 200 per 24, HBM3E 300 per 36, HBM4 about 550 per 36 (estimate), factory gate, with contract about 2x and 20 to 26 week leads (claimed, Silicon Analysts, October 2026); Samsung is asking "mid-to-high $4 per gigabit" for 2027 HBM4 against about 1.5 for HBM3E (claimed, Sammyfans, 2 October 2026).

What it does to the chip's cost per read: the row activation (909 pJ per 1 KB row, HBM2, O'Connor Table 3) does not move; the movement and I/O terms fall with the voltage and the base-die node; a 32-channel stack doubles the activate parallelism the record's HBM rows are bound by (10.7 G reads per second per HBM3 stack, unmeasured; 2.3 G at the JEDEC tFAW). The arithmetic on the record's method: HBM4 1.0 to 1.1 nJ per read and 21.3 G reads per second per stack (166 MH/s at about 36 W, 0.22 microjoules, 11x; at the JEDEC-tFAW ceiling 36 MH/s at 19 W, 0.53, 4.5x); the custom base die 0.9 to 1.0 nJ with its controller inside (166 MH/s at 29 W, 0.18, 14x; 6.5x at the low ceiling). The latency stays in the 45 to 50 ns class; the capacity (36 to 64 GB) is 4x to 8x any floor layer 2 could set without retiring the honest cards.

Who can buy it: through 2027 the stacks are allocated to AI accelerators at Tier-1 volume terms; a custom base die is a per-customer engagement with the DRAM maker. A chip maker of Bitmain's or Canaan's size (the history's rows: tape-outs on 7 nm-class nodes, R&D in the tens of millions of dollars a year) could commission one from 2028 (approximate); a USD 5 M startup cannot. The brake is money and queue, not physics, and it expires.

Blunted by: nothing among the four. The shadow at k = 0.5 holds 4.4x, at k = 1 2.6x; the shadow core is logic on the N3P base die and sits at the band's low end against a GPU on an older node.

4.3 LPDDR6

JESD209-6 (2025) gives 10,667 to 14,400 MT/s on a 24-bit channel split into two 12-bit sub-channels, a 32-byte minimum access with 32 and 64-byte bursts, 4 to 64 Gb dies, lower voltages than LPDDR5, a dynamic efficiency mode and on-die ECC (claimed, JEDEC via PCWorld, HotHardware and MicrocontrollerTips, 2025). The bank count per channel and the tFAW are not in the public summaries read (unverified); LPDDR5's 16 banks per channel and a tFAW near 20 ns are the assumption (approximate). A 32-channel, 64-sub-channel controller chip then reads about 12.8 G dependent reads per second (approximate), 100 MH/s, at 1.5 to 2.0 nJ per read: about 4x to 5x the 5090 per joule, the GDDR7 board's class at a lower price per channel. The dies are the cheapest random-access memory a non-hyperscaler can buy outside the 2026 price cycle (USD 3 to 4 per GB in 2024, approximate; USD 8 to 21 in 2026 LTAs, claimed).

The point of this line is not the chip. The M5 Max already is an LPDDR5X part with a GPU, at 0.78 microjoules per hash measured at the GPU-plus-DRAM meter, 3.1x the 5090 per joule; the Windows-class LPDDR5X SoCs (NVIDIA's and Qualcomm's desktop parts, approximate) and the LPDDR6 generation after them are the honest tier's floor. A controller chip on the same memory beats that tier by 1.3x to 1.6x at zero shadow. The resistance of the chain is set by this tier, and v6 should say so (finding 3).

Blunted by: none needed.

4.4 3D DRAM

Samsung's VS-DRAM (VLSI 2023), 16 stacked layers demonstrated against Micron's 8, VCT 4F2 cells as the stepping stone with prototypes in 2025 and commercial 3D DRAM "by approximately 2030"; Neo Semiconductor's 3D X-DRAM at 230 layers and 128 Gbit per die as a concept (claimed, heise 29 May 2024, Yole, ComputerBase). No source read claims a latency or activate-rate change; the gain is capacity per area (about 3x). For a chip that reads 1 to 8 GiB at random, capacity per die is not the constraint (channels are), so 3D DRAM lowers the honest card's and the chip's cost per GB alike and changes no row. Outside the five-year edge.

4.5 CXL memory pools

CXL 2.0 expanders on Xeon 6 measure 100 to 160 ns against 75 ns local DDR5; a CXL 3.1 controller adds about 70 ns; pooled DDR5 was USD 4 to 7 per GB before the 2026 cycle (claimed, Introl, 1 February 2026, and the search summaries). A dependent chain through a host CPU and a PCIe-class link at 64 bytes per transaction is bound by the link's transaction rate (about 500 M per second per x8 device at about 25 W, approximate): 0.4x the 5090 per watt. A capacity tool. No edge, no layer needed.

4.6 Wafer-scale

The WSE-3 holds 44 GB of SRAM at 21 PB/s across 900,000 cores on 46,225 mm^2 of N5; the CS-3 draws about 23 kW and costs "maybe $2.5 million" (claimed, Cerebras and The Next Platform, 14 March 2024; the power from the search summaries). A 2 GiB dataset spread over the wafer is read by a dependent chain whose next address is uniformly random across 215 mm of mesh: the traffic is all-to-all, the mesh is bisection-bound, and the average reply crosses about 140 mm of wire. At about 0.1 pJ per bit per mm (approximate) a 512-bit reply costs about 7 nJ before routers, 3x the GDDR7 board's 2.0; at about 950 links across the bisection at 32 bits per cycle and about 1 GHz (approximate), the wafer completes about 110 G reads per second, 500 G with the dataset replicated twenty times in regions, 5 to 22 M reads per second per watt against the 5090's 54 M. Per joule 0.1x to 0.4x, per dollar one thousandth. The wafer is a streaming machine; this hash is not streaming. No layer needed; layer 2 removes the replicas as the dataset grows.

4.7 Chiplets, interposers and optical I/O

UCIe gives 0.25 to 0.5 pJ per bit by package type (claimed, UCIe consortium via SNIA SDC 2022 and 2025 pages); BoW 0.5 to 0.7; CoWoS-S is USD 600 to 900 per H100-class package and a one-stack interposer about USD 200 (the record). A read that crosses a die boundary pays about 0.27 nJ (544 bits at 0.5 pJ) and 5 to 10 ns, which is what makes the multi-die SRAM chip of 4.9 cost 1.1 to 1.3 nJ per read instead of 1.0. Optical I/O (Ayar Labs' TeraPHY at about 5 pJ per bit, UCIe-compliant, a USD 500 M round on 3 March 2026; Celestial AI's Photonic Fabric at 6.2 pJ per bit and about 120 ns round trip; claimed) is 6x to 8x the interposer's energy per bit and adds latency: it pools memory across packages, which this traffic never wants. No row moves.

4.8 FPGA with HBM

The Alveo V80 (Versal XCV80, 32 GB HBM2e as two 16 GB stacks, 820 GB/s, 190 W, USD 9,495 MSRP, May 2024) and the U55C (USD 4,747) are what a non-hyperscaler can buy today with HBM on it; Altera's Agilex 7 M-series carries the same two HBM2e stacks at 820 GB/s (claimed, AMD, Wccftech, The Next Platform). The record's reading stands: an HBM2 stack under a soft controller reaches the JEDEC tFAW ceiling, 2.3 to 2.4 G random reads per second (Shuhai, FCCM 2020, Figure 7), so two stacks give about 4.8 G, about 37 MH/s at about 150 W (approximate), 0.6x the 5090 per joule at 5x its price. No HBM3E FPGA was found announced in the pages read (unverified). No layer needed.

4.9 SRAM at 2 nm: the full store on one reticle

TSMC's N2 reads 38 Mb/mm^2 of high-density SRAM, 11 percent over N3E (claimed, IEEE Spectrum, 12 December 2024; volume from 2025); wafers are about USD 30,000 and "booked to 2028" (claimed, tech-insider, 2026). The arithmetic: 2 GiB is 17,180 Mbit, 452 mm^2 of macro; with periphery, a controller, the lanes' registers and a shadow core, a 550 to 650 mm^2 die under the 858 mm^2 reticle; about 95 gross dies per wafer, 55 to 70 percent good with row and column repair (approximate), USD 400 to 600 of silicon. No DRAM, no interposer, an organic package. Under class v5 the dataset's items are leaves of the chain state refreshed per window; the chip rewrites 2 GiB per window at on-die bandwidth, the same 32 ms every GPU pays (the record, chip-model-v3 5.10), and holds a node or shares one across a farm as the record prices.

Energy per read: the macro's 64-byte read, about 0.1 nJ (approximate), plus the global wire. The record took 0.6 pJ per bit of wire across a 128 mm^2 array; scaling with the side of the die gives about 1.3 pJ per bit across 600 mm^2, 0.68 nJ for 512 bits, so about 1.0 nJ per read with the controller, range 0.5 to 2.0 (the sensitivity of every SRAM figure here). Latency 10 to 20 ns. No activate ceiling, no tFAW, no refresh: the rate is power-bound. At 300 W with 30 W of static and controller power: 270 W over 128 nJ per hash is about 2,100 MH/s per die, 0.14 microjoules per hash, 17x the 5090 at zero shadow (13x at 1.3 nJ, 8x at 2.0, 30x at 0.5); USD 0.25 per MH/s of silicon, about 0.4 with the board. Two dies at 4 GiB: half the reads cross one UCIe hop, 1.14 nJ, 15x, USD 1,000. Four dies at 8 GiB: 1.3 nJ, 13x, USD 2,000 to 2,500, a 4-die organic package. The honest cards hold 8 GiB fine (16 GB and up); a floor that pushed the dataset past what a package can hold (16 to 32 GiB, eight to sixteen reticles at USD 5,000 to 10,000 and 1.5 to 2.0 nJ per read, still 7x to 9x) would retire every honest card under 32 GB first. Layer 2 therefore sets this chip's capex and die count, not its joules, and the floor's number is a card-lifetime decision, not a chip decision.

The project: the history's IBS figures (5 nm USD 416 M to 542 M, 3 nm 590 M) price an SoC; an SRAM array with a controller and a sequencer core is simpler and the startup figure ("$50M to $75M" for 7 nm, SemiAnalysis) is the better guide, so USD 100 M to 500 M at N2 (approximate) and 18 to 24 months to a first chip (approximate). That is the clock of Counter ASIC 3.0 item 4 and the daily-issuance threshold of the history (chips at USD 20 K to 50 K of daily issuance for compute-bound hashes; 32 months for Ethash at the largest prize): the SRAM chip arrives when the prize pays for an N2 project, and nothing in the hash moves that date.

Blunted by: layer 2 on capex only (USD 500 to 2,500 across the floor's range); the shadow at k on joules: with the shadow core on the same N2 die against a GPU on N3 or N4 the ALU band sits at 0.3 to 0.5; at F = 1.10 the chip reads 4.8x at k = 0.5 and 2.7x at k = 1; at the 5090's whole latency shadow (about 330,000 ops per hash, F about 2.0, 575 W) 3.7x and 2.0x; against the M5 Max's joule about 3x at k = 0.5.

4.10 RLDRAM and the activate-free line

RLDRAM 3 (Micron, 2011; ISSI second-sourced) has a tRC under 10 ns, 16 banks per device, no separate activate command and "SRAM-like random access" (claimed, Micron's product page and the 2011 announcements), in 576 Mb and 1.125 Gb devices at up to 2,133 Mb/s (approximate). One device completes about 2 G random reads per second (16 banks over 8 ns), six times a GDDR7 device's share of the 5090 board's 21.3 G; sixteen devices, 2 GiB, about 32 G reads per second, 250 MH/s per board. The energy per read is not published in anything read (a power calculator exists); a full small-row access per read at an old node reads 2 to 4 nJ (approximate), so about 5x per joule, at USD 400 to 800 per GB (approximate, a low-volume networking part). It is the proof that an activate-free DRAM exists, and AMD's "Folded Banks" (ISCA 2025, with AMD Research: 8x the activate parallelism in a 3D-stacked HBM gives 6.7x the irregular bandwidth, claimed from the abstract; the PDF refused the fetch) is the same idea on the HBM roadmap. If a DRAM maker ships it in HBM, the activate ceilings in the record's HBM rows rise 6x to 8x and the HBM chip's rate per stack with them; its energy per read falls by the row-size term (O'Connor's FGDRAM: 51 percent). That is the DRAM-on-logic row.

Blunted by: layer 2 on RLDRAM's capacity cost (USD 3,000 to 6,000 at 8 GiB); nothing on the HBM version.

5. The k bands for the research lane's chip rows

For docs/design/class-v6-rotating-family.md. The shadow k is the chip core's energy per forced op over the GPU's at the same operating point (the record's ALU band 0.3 to 0.8 on the 5090's measured 6.2 to 11.3 pJ per op); the memory k_read is the technology's energy per dependent read over the 5090's measured 10.9 nJ. "Edge" is per joule at zero shadow; "with the shadow" is at the class v4 premium F = 1.10 microjoules on the 5090 (E_chip = E_mem + k F).

Chip row Year E_read nJ Rate per chip, MH/s E_hash at zero shadow, microjoules Edge over the 5090 (2.40) Edge over the M5 Max (0.78) k_read Shadow k band With the shadow, k = 0.5 / 1 Silicon and memory, USD per MH/s
GDDR7 board, 28 nm controller (the record) now 2.0 166 0.466 5.1x 1.7x 0.18 0.5 to 0.8 (28 nm core: the high end) 3.3x / 2.1x 2.8 (2025 memory), about 7 in the 2026 cycle
HBM3E, one stack now 1.2 84 (ceiling unmeasured) 0.321 7.5x 2.4x 0.11 0.3 to 0.8 3.8x / 2.4x 6.6
HBM3E, eight stacks now 1.2 666 0.262 9.2x 3.0x 0.11 0.3 to 0.8 4.1x / 2.5x 4.0
HBM4, one stack, N12 base die 2027 to 2028 1.0 to 1.1 166 (36 at the JEDEC tFAW) 0.22 (0.53) 11x (4.5x) 3.6x (1.5x) 0.10 0.3 to 0.8 4.4x / 2.6x about 5
Custom HBM4E base die, N3P, controller in the stack 2028 or later 0.9 to 1.0 166 (36) 0.18 (0.37) 14x (6.5x) 4.4x (2.1x) 0.09 0.3 to 0.5 (an N3P core) 4.4x / 2.6x about 5
DRAM on logic, FGDRAM-class rows, hybrid bonded 2029 to 2031 0.5 to 0.7 125 per stack, 1,000 for eight 0.15 16x (12x to 20x) 5.2x 0.05 0.3 to 0.5 5.1x / 2.8x about 4 (approximate)
SRAM full store, one N2 reticle, 2 GiB 2027 to 2028 (an N2 project) 1.0 (0.5 to 2.0) about 2,100 at 300 W 0.14 17x (8x to 30x) 5.6x 0.09 0.3 to 0.5 (an N2 core) 4.8x / 2.7x 0.25 to 0.4
SRAM full store, two N2 dies, 4 GiB the same 1.14 about 1,850 0.16 15x 4.9x 0.10 0.3 to 0.5 4.6x / 2.7x 0.55
SRAM full store, four N2 dies, 8 GiB the same 1.3 about 1,600 0.185 13x 4.2x 0.12 0.3 to 0.5 4.5x / 2.6x 1.3 to 1.6
LPDDR6 controller chip, 32 channels 2027 1.5 to 2.0 about 100 0.25 to 0.30 4x to 5x 1.3x to 1.6x 0.15 to 0.18 0.3 to 0.8 3.1x / 2.0x about 3 (approximate)
Per-bank PIM, UPMEM, FPGA with HBM2e, wafer-scale, CXL, optical under 1x or no path

Arithmetic, the SRAM row: 270 W over (128 x 1.0 nJ) = 2.11 G hashes per second; 300 W over 2.11 G = 0.142 microjoules; 2.40 over 0.142 = 16.9x; with the shadow at k = 0.5: (0.142 + 0.55) over (2.26 + 1.10) = 0.692 over 3.36 = 4.86x; at k = 1: 1.242 over 3.36 = 2.71x. The base-die row: 166 M x 128 x 0.95 nJ = 20.2 W plus 4 static plus 5 controller = 29.2 W; 29.2 over 166 M = 0.176 microjoules; 2.40 over 0.176 = 13.6x. The M5 Max column divides 0.78 by the same E_hash. Every chip-side figure is modelled; the GPU-side figures are the record's measurements.

6. Consequences per tier

Tier What this file means What is being done
Home miner, one 8 GB card Nothing changes today: no chip exists, and the first one in this file (an N2 SRAM die or an HBM4 base-die chip) is a USD 100 M-class project with a 2028-class date. When one lands it runs at 0.14 to 0.22 microjoules per hash against this card's 10 to 20; this tier is the first out, as the record says. The dataset's floor decides this tier's life more than any chip does: 4 GiB at year 4 (the spec's schedule) retires it then the shadow sizing and the floor are the founder's numbers to set (section 7); the share-pattern detector (Counter ASIC 3.0 item 4) is what tells this miner a chip has arrived
One 16 GB card (9070 XT class) Holds 8 GiB with room; AMD's 2.4 G reads per second at 304 W is 7x behind the 5090 per joule and 50x to 100x behind the chips here the vendor-share metric; nothing in the hash moves AMD's dependent-read rate
One 24 or 32 GB card, the 5090 at the lock 1.67 microjoules at the 1,300 MHz lock; the chips here are 8x to 12x ahead per joule at zero shadow and 2.5x to 4x with the class v4 shadow at k = 0.5 the Ember knob carries the lock rows; the shadow's upper bound at the full ALU budget is the lever this file sizes
The unified-memory SoC (M5 Max, LPDDR5X and LPDDR6 desktops) 0.78 microjoules at the GPU-plus-DRAM meter: the honest tier the chips beat least (1.7x to 5.6x at zero shadow, about 3x with the shadow). Capex-poor (27 MH/s per USD 4,000 machine) but joule-rich finding 3: v6 scores the floor and the shadow per tier with this tier as the reference joule; the dataset stays inside 16 GB unified memory
A rig A rig's cost is electricity; against an N2 SRAM chip at USD 0.3 per MH/s and 0.14 microjoules it earns 1/10 to 1/17 of a chip per watt and leaves when chips hold the hashrate the issuance trigger: the bounty and the benchmark live before daily issuance crosses about USD 50 K (the record)
A pool user A chip fleet is a few operators; the share-pattern detector is the warning the detector on the observer, before the public testnet (the record)
The public claim "Under 2x" is not reachable against any chip in this file at a k under 1. The honest sentence is: the strongest chip five years out beats a 5090 by 2.6x to 2.8x per joule at k = 1 and about 4.5x at k = 0.5 with the shadow on, and the best honest SoC by about 3x; and it costs an N2 project the research lane's synthesis carries the number; nothing from this file goes to the site or the devnet

7. Decisions this raises for the founder

Each carries a default and a deadline; silence means the default.

  1. Size the shadow against the SRAM chip, not the GDDR7 board. Layer 1's program-length draw gets a lower bound at the length that holds the record's 2.1x on the GDDR7 chip today and an upper bound at the honest cards' full latency shadow (the 5090's about 330,000 ops unlocked, about 150,000 at the lock; the M5 Max about 290,000; the 9070 XT about 650,000; approximate from the record), re-based at every family epoch on the cards then mining. Default: the research lane writes the draw with these bounds into the synthesis; the hash lane measures the rate and the watts at the upper bound on the 5090 and the M5 Max before the first v6 era is cut. Deadline: 20:00 UK today (the synthesis).
  2. The floor (layer 2). 2 GiB at genesis is one N2 reticle; 4 GiB two; 8 GiB four. The floor moves the chip's capex (USD 500 to 2,500), not its joules (17x to 13x), and 8 GiB is the last size inside 16 GB unified memory and the 16 GB card tier. Default: the spec's schedule stands (2 GiB plus 0.5 GiB a year, doubling at year 4), chosen on card lifetime; the floor is not a chip lever and this file does not ask to raise it. Deadline: none; a note in the synthesis.
  3. The reference joule (a fifth layer, or a rule). Resistance is stated against the best honest joule (the unified-memory SoC tier, then the 5090 at the lock), not the unlocked 5090. Default: the research lane adopts it in the synthesis's chip rows (section 5's M5 Max column) and the public text, when there is one, carries the edge over the best honest joule. Deadline: 20:00 UK today.
  4. The clock. The chips in this file are USD 100 M-class projects with 2028-class dates; the issuance trigger, the benchmark and the share-pattern detector of Counter ASIC 3.0 item 4 are what decide when they are built. Default: unchanged from the record. Deadline: none.

8. Unverified and owed

  • Every chip-side energy figure is modelled on the record's method (O'Connor's HBM2 breakdown, Samsung's pJ per bit roadmap, the 909 pJ row activation standing in for HBM3, HBM4 and GDDR7); the SRAM wire figure (0.6 pJ per bit at 128 mm^2, scaled with the die's side) is from memory and moves the SRAM rows by 2x either way; the UCIe hop (0.5 pJ per bit) is the consortium's claim; the FGDRAM row size (256 bytes) and its 51 percent are the paper's simulation.
  • HBM4's banks per pseudo-channel and tFAW per channel are behind the JEDEC paywall (the Business Wire and All About Circuits pages refused the fetch); the "2x the activate ceiling" rests on 32 channels with tFAW per channel, as the record's HBM rows rest on the same assumption at 16; both unmeasured. The AWS F2 hour the record names (chip-model-v3 5.3) is still the one measurement that would settle the HBM2 figure, and an HBM3 or HBM4 part is not rentable at the controller level by anyone outside a hyperscaler today.
  • LPDDR6's bank count and tFAW are not in the summaries read; the row is LPDDR5's structure (approximate).
  • RLDRAM 3's energy per read and its 2026 price are not published in anything read; the row is approximate.
  • The Cerebras mesh figures (link width, clock, bisection) are approximate; the fabric bandwidth was not on the pages read (The Next Platform gives only its change against WSE-2).
  • Dates: the DRAM-on-logic and hybrid-bonded HBM timelines ("2028 to 2031") are approximate; the sources read give 3D DRAM "from 2030" and C-HBM4E production in 2027; the hybrid-bonding pages were not fetched (the TrendForce page refused). The N2 project cost and time are approximate.
  • The web-search budget of this session ran out at about 11:3x UK after 26 searches; the remaining facts were read by direct fetch of the pages named in section 9. Pages that refused (403): JEDEC's Business Wire release, All About Circuits, ACM's Folded Banks page, OC3D's GDDR7 capacity note, All About Circuits' HBM-PIM note. Their figures are carried from the search summaries and marked claimed.
  • Nothing was run on the Mac; nothing was built or benchmarked anywhere. The one measurement this file would want next is on the record's queue already: the 5090 and the M5 Max at the shadow's upper bound (decision 1).

9. Sources (URL and the date read; all read 8 October 2026 unless a file is named)

Repository: docs/analysis/chip-model-v3.md (sections 5.1 to 5.11, 6); docs/analysis/counter-asic-4-research.md on branch counter-asic-4 at fb61ed4b (sections 1, 15.1a, 20.4); docs/analysis/asic-resistance-history.md (2.5, 2.6); docs/plans/counter-asic-3-status.md (7c, the clock grid); docs/spec/01-lottery-hash.md (1.8, 1.13.3, 1.14); docs/analysis/latency-shadow-2026-10-06.md; docs/analysis/sram-mirror.md.