igneum/docs
2026-10-05 07:24:38 +00:00
..
analysis Difficulty: the live oscillation of 4 October, its cause, the DAG replay and rule v2 (reference window 600 behind a height switch) 2026-10-04 13:26:23 +00:00
benchmarks Finality rule v3 (ledger F21, F22): simulator scenario M, spec 03 Q4/Q5, cloud vote-timing analysis, v3 harness runner, fast-time profile, bench-log entry, devnet rollout plan 2026-10-04 20:04:12 +00:00
brand Brand: before/after Finder renders of the app and DMG volume icons (docs/brand) 2026-10-04 11:51:11 +00:00
commercial Provenance: credit every borrowed component, upstream merge procedure, prover customer brief 2026-10-03 20:02:16 +00:00
design Site polish: one header and footer from partials on every page, litepaper section router fixed, self-hosted fonts, 404 page, live page idle cost 2026-10-04 20:57:20 +00:00
legal Add the IGNEUM trade mark clearance search (3 Oct 2026) 2026-10-03 19:00:08 +00:00
plans Finality rule v3 (ledger F21, F22): simulator scenario M, spec 03 Q4/Q5, cloud vote-timing analysis, v3 harness runner, fast-time profile, bench-log entry, devnet rollout plan 2026-10-04 20:04:12 +00:00
spec E15 decided: the 4 billion cap stays, no tail emission; spec 5.10 with the measured security-budget table and the review trigger, O-5.11 closed, litepaper and homepage state the cap and the years 2026-10-05 07:24:38 +00:00
bench-log.md Merge branch 'igneum-wt-finality' 2026-10-04 20:06:11 +00:00
bugs.md bugs.md: the collect-exit branch rebased and fully tested 2026-10-04 21:47:22 +00:00
evidence.md Bench log: shard proving on the RTX 5090 measured (10.9 s per shard, 2.2 s aggregation); evidence rows 15 and 16; journey line 2026-10-04 18:17:16 +00:00
fork-divergence.md Docs: devnet-v4 integration section (merge order, devnet v4 rules, compatibility, cut-over commands) and bench-log entry 2026-10-04 01:23:42 +00:00
fork-map.md Finality quorum: 2/3 of active weight and at least 56.7% of total, per simulation v2 2026-10-03 16:15:15 +00:00
fud-fixes.md FUD ledger sweep, round 4: M25 confirmed on a real-PoW test node (mismatched day length rejected with no reason named), fix row 127 2026-10-05 01:09:07 +00:00
fud-ledger.md E15 decided: the 4 billion cap stays, no tail emission; spec 5.10 with the measured security-budget table and the review trigger, O-5.11 closed, litepaper and homepage state the cap and the years 2026-10-05 07:24:38 +00:00
provenance.md Provenance: credit every borrowed component, upstream merge procedure, prover customer brief 2026-10-03 20:02:16 +00:00