| .. |
|
analysis
|
Difficulty: the live oscillation of 4 October, its cause, the DAG replay and rule v2 (reference window 600 behind a height switch)
|
2026-10-04 13:26:23 +00:00 |
|
benchmarks
|
Docs: ledger P12 fixed in the proving code and P20 fixed in the host; spec 7.6 shard statement definitions and the provisional S_p; benchmark standard rows
|
2026-10-04 10:10:17 +00:00 |
|
brand
|
Brand: before/after Finder renders of the app and DMG volume icons (docs/brand)
|
2026-10-04 11:51:11 +00:00 |
|
commercial
|
Provenance: credit every borrowed component, upstream merge procedure, prover customer brief
|
2026-10-03 20:02:16 +00:00 |
|
design
|
Igneum console at the relay URL: Machines, Jobs, Builds, Chain, Work log, Results and the relay as tabs
|
2026-10-04 13:53:33 +00:00 |
|
legal
|
Add the IGNEUM trade mark clearance search (3 Oct 2026)
|
2026-10-03 19:00:08 +00:00 |
|
plans
|
Evidence: 4 October measurements (live hourly swap, first live lock and the 280 locks since, first GPU proof, one-click worker, generator v2, difficulty oscillation and v2 pending, 12-node propagation and partition, clock skew); rows 29 and 30 added; difficulty and floor claims softened
|
2026-10-04 13:52:45 +00:00 |
|
spec
|
Difficulty: the live oscillation of 4 October, its cause, the DAG replay and rule v2 (reference window 600 behind a height switch)
|
2026-10-04 13:26:23 +00:00 |
|
bench-log.md
|
Bench log: first outside machine on the devnet (an Apple silicon laptop through the app)
|
2026-10-04 13:51:32 +00:00 |
|
evidence.md
|
Evidence row 30: four machines on the app
|
2026-10-04 13:56:11 +00:00 |
|
fork-divergence.md
|
Docs: devnet-v4 integration section (merge order, devnet v4 rules, compatibility, cut-over commands) and bench-log entry
|
2026-10-04 01:23:42 +00:00 |
|
fork-map.md
|
Finality quorum: 2/3 of active weight and at least 56.7% of total, per simulation v2
|
2026-10-03 16:15:15 +00:00 |
|
fud-fixes.md
|
External review of the litepaper: response, 15 ledger entries, fix rows, open items, four-state rule, miner-app rules, phase-2 gate
|
2026-10-03 22:29:41 +00:00 |
|
fud-ledger.md
|
Difficulty: the live oscillation of 4 October, its cause, the DAG replay and rule v2 (reference window 600 behind a height switch)
|
2026-10-04 13:26:23 +00:00 |
|
provenance.md
|
Provenance: credit every borrowed component, upstream merge procedure, prover customer brief
|
2026-10-03 20:02:16 +00:00 |