| .. |
|
analysis
|
Income per tier: the three tariffs are USD 0.05, 0.10 and 0.25 a kWh (cheap industrial, US retail, UK retail; the coordinator's answer, 7 October 2026), the table regenerated, the cost per mined IGN shown to three significant figures
|
2026-10-07 08:54:44 +00:00 |
|
api
|
Public stats API: /api/stats and /api/supply, documented with live examples, contract test and a live check
|
2026-10-05 19:35:40 +00:00 |
|
benchmarks
|
Counter ASIC 3.0 items 6 and 7: proposed reserve order and spec text (docs/plans/counter-asic-3-reserve.md), the vendor-share section on the benchmark page, the observer README row
|
2026-10-06 07:40:41 +00:00 |
|
brand
|
Brand: before/after Finder renders of the app and DMG volume icons (docs/brand)
|
2026-10-04 11:51:11 +00:00 |
|
commercial
|
Public text: the proving price as a formula in network hash, one threshold sentence, the carried-proof caveat, the dev fee's share, the stranded pool (Horizon economy and security lanes)
|
2026-10-06 20:16:05 +00:00 |
|
community
|
Discord structure: release webhook moved to #releases, post 1's channel line edited by webhook; both read back (7 October 2026, 13:1x UK)
|
2026-10-07 12:14:12 +00:00 |
|
design
|
EVM transaction relay: design doc 1.4 "Relay", rows 463 and 9 closed, bench-log entry, 3-node relay harness
|
2026-10-05 17:53:07 +00:00 |
|
evidence/reproduced
|
Repro 0.3.14 and 0.3.15 re-run with sccache off (RUSTC_WRAPPER pass-through): A vs B MATCH on all eight artefacts, hashes unchanged; evidence files regenerated
|
2026-10-06 20:22:06 +00:00 |
|
legal
|
Add the IGNEUM trade mark clearance search (3 Oct 2026)
|
2026-10-03 19:00:08 +00:00 |
|
plans
|
Counter ASIC 3.0 status: the proving-ids control (the environment names the ids on c4459193), the late-join commit 70e4601e for 0.3.21
|
2026-10-07 13:33:16 +00:00 |
|
posts
|
Hero shortened on the project lead's word (6 October 2026, 16:4x UTC): the same claims in 70 words; the reddit post saved as docs/posts/reddit-2026-10-06.md
|
2026-10-06 16:20:01 +00:00 |
|
security
|
Key custody: inventory, encrypted backup and restore, no-secrets CI check
|
2026-10-05 17:01:01 +00:00 |
|
spec
|
Counter ASIC 3.0: mixer_mult = 8 in spec 1.13.1 and mixer-x4.md section 2 (item 3's finding); item 3 closed in the status file
|
2026-10-06 07:31:02 +00:00 |
|
testnet
|
Merge fee-switch into release-0.3.9: the prover mirrors both fee tables and fees_v1_activation_daa (new pinned guest), the devnet runbook for H = 210,000
|
2026-10-05 16:28:21 +00:00 |
|
bench-log.md
|
Merge origin/master into ca3-coord: the status file keeps the 7 October rows (a20d238f's merge had taken its 6 October side), the bench-log keeps both sides
|
2026-10-07 12:24:27 +00:00 |
|
bugs.md
|
app: every elevated launch through one hidden-console builder; CI check for Windows spawns; PC 1 console watchers
|
2026-10-06 08:21:46 +00:00 |
|
evidence.md
|
site-ui-4: the header on every page (six items, Download, the burger with its open state and aria), OS marks on the download cards, the footer redesign (icon row GitHub, Discord, Reddit; Contact eyebrow; one baseline grid; the state word and the year), the chip-model text (prize sentence cut, the bounded hot-set row), live-dag.js 2.0.2 narrow options for phones, the nav build check, the word-bounded rig-name check
|
2026-10-07 09:59:42 +00:00 |
|
fork-divergence.md
|
Docs: devnet-v4 integration section (merge order, devnet v4 rules, compatibility, cut-over commands) and bench-log entry
|
2026-10-04 01:23:42 +00:00 |
|
fork-map.md
|
Finality quorum: 2/3 of active weight and at least 56.7% of total, per simulation v2
|
2026-10-03 16:15:15 +00:00 |
|
fud-fixes.md
|
Site truth, 6 October 2026: the ledger's stated sentences merged, the bounty struck, draft (a) on the chip line, the measured prover tiers, the ledger page, the evidence page generated from its source, the live scene reading the live state
|
2026-10-06 16:12:30 +00:00 |
|
fud-ledger.md
|
Merge origin/master into ca3-coord: the status file keeps the 7 October rows (a20d238f's merge had taken its 6 October side), the bench-log keeps both sides
|
2026-10-07 12:24:27 +00:00 |
|
provenance.md
|
Provenance: credit every borrowed component, upstream merge procedure, prover customer brief
|
2026-10-03 20:02:16 +00:00 |