| .. |
|
analysis
|
Horizon close: the one page for the project lead (597 words, every lane landed, each item marked done / in 0.3.16 / decision owed), the two standing decisions of 22:3x UK recorded in ledger-decisions.md, lane 5's experiment and ledger-decisions.md brought onto master
|
2026-10-06 21:37:31 +00:00 |
|
api
|
Public stats API: /api/stats and /api/supply, documented with live examples, contract test and a live check
|
2026-10-05 19:35:40 +00:00 |
|
benchmarks
|
Counter ASIC 3.0 items 6 and 7: proposed reserve order and spec text (docs/plans/counter-asic-3-reserve.md), the vendor-share section on the benchmark page, the observer README row
|
2026-10-06 07:40:41 +00:00 |
|
brand
|
Brand: before/after Finder renders of the app and DMG volume icons (docs/brand)
|
2026-10-04 11:51:11 +00:00 |
|
commercial
|
Public text: the proving price as a formula in network hash, one threshold sentence, the carried-proof caveat, the dev fee's share, the stranded pool (Horizon economy and security lanes)
|
2026-10-06 20:16:05 +00:00 |
|
community
|
Home page restored and polished for the miner: the step scene with the shards, the glow and the final line brought up to date; live network strip; measured card picker; Discord; no calendar month
|
2026-10-06 21:37:38 +00:00 |
|
design
|
EVM transaction relay: design doc 1.4 "Relay", rows 463 and 9 closed, bench-log entry, 3-node relay harness
|
2026-10-05 17:53:07 +00:00 |
|
evidence/reproduced
|
Repro 0.3.14 and 0.3.15 re-run with sccache off (RUSTC_WRAPPER pass-through): A vs B MATCH on all eight artefacts, hashes unchanged; evidence files regenerated
|
2026-10-06 20:22:06 +00:00 |
|
legal
|
Add the IGNEUM trade mark clearance search (3 Oct 2026)
|
2026-10-03 19:00:08 +00:00 |
|
plans
|
Merge site-ui-3 13fafe3338: the home page restored and polished for the miner (the step scene as the hero, the network strip, the measured card picker, the Discord line). The owner, 6 October 2026: "Ok new page approved".
|
2026-10-06 21:42:16 +00:00 |
|
posts
|
Hero shortened on the project lead's word (6 October 2026, 16:4x UTC): the same claims in 70 words; the reddit post saved as docs/posts/reddit-2026-10-06.md
|
2026-10-06 16:20:01 +00:00 |
|
security
|
Key custody: inventory, encrypted backup and restore, no-secrets CI check
|
2026-10-05 17:01:01 +00:00 |
|
spec
|
Counter ASIC 3.0: mixer_mult = 8 in spec 1.13.1 and mixer-x4.md section 2 (item 3's finding); item 3 closed in the status file
|
2026-10-06 07:31:02 +00:00 |
|
testnet
|
Merge fee-switch into release-0.3.9: the prover mirrors both fee tables and fees_v1_activation_daa (new pinned guest), the devnet runbook for H = 210,000
|
2026-10-05 16:28:21 +00:00 |
|
bench-log.md
|
Prover tiers on real cards (eleven rented cards, patched SP1 server) and the rental cost of hash: the analysis file and its two bench-log entries, cut from gpu-fleet for the site
|
2026-10-06 19:21:28 +00:00 |
|
bugs.md
|
app: every elevated launch through one hidden-console builder; CI check for Windows spawns; PC 1 console watchers
|
2026-10-06 08:21:46 +00:00 |
|
evidence.md
|
Site truth, 6 October 2026: the ledger's stated sentences merged, the bounty struck, draft (a) on the chip line, the measured prover tiers, the ledger page, the evidence page generated from its source, the live scene reading the live state
|
2026-10-06 16:12:30 +00:00 |
|
fork-divergence.md
|
Docs: devnet-v4 integration section (merge order, devnet v4 rules, compatibility, cut-over commands) and bench-log entry
|
2026-10-04 01:23:42 +00:00 |
|
fork-map.md
|
Finality quorum: 2/3 of active weight and at least 56.7% of total, per simulation v2
|
2026-10-03 16:15:15 +00:00 |
|
fud-fixes.md
|
Site truth, 6 October 2026: the ledger's stated sentences merged, the bounty struck, draft (a) on the chip line, the measured prover tiers, the ledger page, the evidence page generated from its source, the live scene reading the live state
|
2026-10-06 16:12:30 +00:00 |
|
fud-ledger.md
|
Home page restored and polished for the miner: the step scene with the shards, the glow and the final line brought up to date; live network strip; measured card picker; Discord; no calendar month
|
2026-10-06 21:37:38 +00:00 |
|
provenance.md
|
Provenance: credit every borrowed component, upstream merge procedure, prover customer brief
|
2026-10-03 20:02:16 +00:00 |