| .. |
|
analysis
|
Site, 7 October 2026 evening (the project lead's four asks through main, one landing): (1) the bar's nav to the right: the mark and the devnet pill on the left, Mine, Network, Learn and the controls right-aligned with the same gaps and sizes, each open panel anchored under its button (the script sets --panel-left) and a panel that would run past the container aligned to its button's right edge, the phone sheet unchanged; (2) no lateral scroll: tools/ci/scroll-width-check.mjs on the gate (scrollWidth equals clientWidth on every route at 390, 768, 1024, 1280 and 1440 in both themes; only a table, code or diagram scrolls inside its own overflow-x box; self-test with a 100vw plus 20 px fixture known-failed first); (3) LG-5, the launch text: the front page leads with the three wants (hardware that stays useful, income without a cliff, a fair supply) and the live network with finality is the second screen; the litepaper's regulatory note reads "Not legal advice." alone over its eight sentences from future.md 8.3 (the project lead: counsel not yet; the string "counsel is engaged" is in both forbidden-strings lists and gone from the research heading), the pay sentence stays; the journey's phase line reads Devnet 3 live, testnet next; (4) LG-1, /income: docs/analysis/income-tiers.md published as a page by tools/launch/income-page.mjs (checked on the gate against the document), listed under Learn, labels on every number, no price of IGN anywhere
|
2026-10-07 19:12:04 +00:00 |
|
api
|
Public stats API: /api/stats and /api/supply, documented with live examples, contract test and a live check
|
2026-10-05 19:35:40 +00:00 |
|
benchmarks
|
Counter ASIC 3.0 items 6 and 7: proposed reserve order and spec text (docs/plans/counter-asic-3-reserve.md), the vendor-share section on the benchmark page, the observer README row
|
2026-10-06 07:40:41 +00:00 |
|
brand
|
Brand: before/after Finder renders of the app and DMG volume icons (docs/brand)
|
2026-10-04 11:51:11 +00:00 |
|
commercial
|
Public text: the proving price as a formula in network hash, one threshold sentence, the carried-proof caveat, the dev fee's share, the stranded pool (Horizon economy and security lanes)
|
2026-10-06 20:16:05 +00:00 |
|
community
|
Discord structure: release webhook moved to #releases, post 1's channel line edited by webhook; both read back (7 October 2026, 13:1x UK)
|
2026-10-07 12:14:12 +00:00 |
|
design
|
Genesis forward-compatibility: key hashes in the harness summaries cut to 16 hex characters (the no-secrets gate reads committed summaries; the writer redacts at write time)
|
2026-10-07 14:02:24 +00:00 |
|
evidence/reproduced
|
Repro 0.3.14 and 0.3.15 re-run with sccache off (RUSTC_WRAPPER pass-through): A vs B MATCH on all eight artefacts, hashes unchanged; evidence files regenerated
|
2026-10-06 20:22:06 +00:00 |
|
legal
|
Add the IGNEUM trade mark clearance search (3 Oct 2026)
|
2026-10-03 19:00:08 +00:00 |
|
plans
|
Site, 7 October 2026 evening (the project lead's four asks through main, one landing): (1) the bar's nav to the right: the mark and the devnet pill on the left, Mine, Network, Learn and the controls right-aligned with the same gaps and sizes, each open panel anchored under its button (the script sets --panel-left) and a panel that would run past the container aligned to its button's right edge, the phone sheet unchanged; (2) no lateral scroll: tools/ci/scroll-width-check.mjs on the gate (scrollWidth equals clientWidth on every route at 390, 768, 1024, 1280 and 1440 in both themes; only a table, code or diagram scrolls inside its own overflow-x box; self-test with a 100vw plus 20 px fixture known-failed first); (3) LG-5, the launch text: the front page leads with the three wants (hardware that stays useful, income without a cliff, a fair supply) and the live network with finality is the second screen; the litepaper's regulatory note reads "Not legal advice." alone over its eight sentences from future.md 8.3 (the project lead: counsel not yet; the string "counsel is engaged" is in both forbidden-strings lists and gone from the research heading), the pay sentence stays; the journey's phase line reads Devnet 3 live, testnet next; (4) LG-1, /income: docs/analysis/income-tiers.md published as a page by tools/launch/income-page.mjs (checked on the gate against the document), listed under Learn, labels on every number, no price of IGN anywhere
|
2026-10-07 19:12:04 +00:00 |
|
posts
|
Hero shortened on the project lead's word (6 October 2026, 16:4x UTC): the same claims in 70 words; the reddit post saved as docs/posts/reddit-2026-10-06.md
|
2026-10-06 16:20:01 +00:00 |
|
security
|
Key custody: inventory, encrypted backup and restore, no-secrets CI check
|
2026-10-05 17:01:01 +00:00 |
|
spec
|
Era VDF lane (7 October 2026): spec 04 sections 4.2, 4.4, 4.5 and 4.6 completed for the era path (the scheme byte and the hash-chain fallback, the cut rule under the O-4.3 reading, the day-of-blues input, the delay, the seed, the era constants as measured), spec 01 section 1.13.1 and era-layout.md section 8 updated, open items O-4.8 closed and O-4.10 to O-4.12 added, FUD ledger F11 updated, two decisions for the project lead in ledger-decisions.md, the record docs/analysis/era-vdf-2026-10-07.md (what was built, the parameters and measured rates, the harness gate with both runs, the cut rule for the finality lane, the verify gate, the tiers), the F7 re-roll harness against the real era cut (tools/era-vdf/reroll.mjs: --vdf off fires 6 of 6, --vdf on silent 0 of 6; the adversary evaluates asynchronously with the node's own code and is found by the node's own log line), the fast-time file's era fields
|
2026-10-07 15:24:22 +00:00 |
|
testnet
|
Merge fee-switch into release-0.3.9: the prover mirrors both fee tables and fees_v1_activation_daa (new pinned guest), the devnet runbook for H = 210,000
|
2026-10-05 16:28:21 +00:00 |
|
bench-log.md
|
RTX 5060 Ti (16 GB, Razer Core X V2 Thunderbolt) on PC 2: detection, G1 bit-exact on class v4 sub-version 1 and the v3 control, the 10-minute stock window, the bench-log entry, the card-picker entry and the public table row
|
2026-10-07 15:05:47 +00:00 |
|
bugs.md
|
app: every elevated launch through one hidden-console builder; CI check for Windows spawns; PC 1 console watchers
|
2026-10-06 08:21:46 +00:00 |
|
evidence.md
|
site: the chip claim launch-first in the four public places (Counter ASIC lane, docs/plans/counter-asic-3-public-text-2026-10-07.md sections 1 to 4, on the project lead's "I thought we were making it 2.1 from launch?")
|
2026-10-07 16:34:12 +00:00 |
|
fork-divergence.md
|
Docs: devnet-v4 integration section (merge order, devnet v4 rules, compatibility, cut-over commands) and bench-log entry
|
2026-10-04 01:23:42 +00:00 |
|
fork-map.md
|
Finality quorum: 2/3 of active weight and at least 56.7% of total, per simulation v2
|
2026-10-03 16:15:15 +00:00 |
|
fud-fixes.md
|
Site truth, 6 October 2026: the ledger's stated sentences merged, the bounty struck, draft (a) on the chip line, the measured prover tiers, the ledger page, the evidence page generated from its source, the live scene reading the live state
|
2026-10-06 16:12:30 +00:00 |
|
fud-ledger.md
|
Merge origin/master 90501503 into ca3-v4-amend (igneum-pow kept byte-identical to the frozen c3d32437 per main's stop-the-line ruling; the ledger keeps both sides)
|
2026-10-07 16:40:29 +00:00 |
|
provenance.md
|
Provenance: credit every borrowed component, upstream merge procedure, prover customer brief
|
2026-10-03 20:02:16 +00:00 |