igneum/docs
igneum-labs 585a9e7f0c Execution layer devnet v3: implementation notes, bench entry, viem smoke test
docs/design/execution-layer.md section 10: what the execution-layer branch implements
(D1 to D10, RPC, differential), the devnet rules fixed there, what is missing, the merge
plan with the finality branch. docs/bench-log.md: the 3-node simnet run with numbers.
tools/evm-smoke: viem 2.57 smoke test (fund, 50 transfers, duplicates in parallel blocks,
contract deploy and call, state roots across nodes, export for igneum-exec-diff) and the
solc build of DeveloperRegistry and the Counter test contract.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-03 22:05:33 +00:00
..
commercial Provenance: credit every borrowed component, upstream merge procedure, prover customer brief 2026-10-03 20:02:16 +00:00
design Execution layer devnet v3: implementation notes, bench entry, viem smoke test 2026-10-03 22:05:33 +00:00
legal Add the IGNEUM trade mark clearance search (3 Oct 2026) 2026-10-03 19:00:08 +00:00
plans infra: cloud devnet (20 nodes), rented GPU bench and seed node scripts; plans for both 2026-10-03 22:01:50 +00:00
spec Finality v2: fork reading guide, spec implementation notes, bench entry, observer checkpoints, live page locks 2026-10-03 21:54:24 +00:00
bench-log.md Execution layer devnet v3: implementation notes, bench entry, viem smoke test 2026-10-03 22:05:33 +00:00
fork-divergence.md Finality v2: fork reading guide, spec implementation notes, bench entry, observer checkpoints, live page locks 2026-10-03 21:54:24 +00:00
fork-map.md Finality quorum: 2/3 of active weight and at least 56.7% of total, per simulation v2 2026-10-03 16:15:15 +00:00
fud-fixes.md Review round 3: litepaper reorg bound and emission sentences, design 5.5 veto (F15, E10, P11) 2026-10-03 20:46:40 +00:00
fud-ledger.md Review round 3: litepaper reorg bound and emission sentences, design 5.5 veto (F15, E10, P11) 2026-10-03 20:46:40 +00:00
provenance.md Provenance: credit every borrowed component, upstream merge procedure, prover customer brief 2026-10-03 20:02:16 +00:00