igneum/docs
2026-10-04 11:04:54 +00:00
..
analysis Difficulty: timestamp attack fixed in spec 2.3, simulator, analysis addendum, ledger M23 2026-10-04 00:56:20 +00:00
benchmarks Docs: ledger P12 fixed in the proving code and P20 fixed in the host; spec 7.6 shard statement definitions and the provisional S_p; benchmark standard rows 2026-10-04 10:10:17 +00:00
commercial Provenance: credit every borrowed component, upstream merge procedure, prover customer brief 2026-10-03 20:02:16 +00:00
design Live DAG: screenshots of the chain rail layout 2026-10-04 10:17:06 +00:00
legal Add the IGNEUM trade mark clearance search (3 Oct 2026) 2026-10-03 19:00:08 +00:00
plans Proving plan: shards implemented and measured on the Mac CPU; bench-log entry for the devnet v4 shards (GPU row empty until the PC runs) 2026-10-04 10:26:52 +00:00
spec Docs: ledger P12 fixed in the proving code and P20 fixed in the host; spec 7.6 shard statement definitions and the provisional S_p; benchmark standard rows 2026-10-04 10:10:17 +00:00
bench-log.md Bench log: the gfx1036 worker fault, the two Apple OpenCL soaks (no reproduction, no leak) and the injected-fault check; ignore the soak outputs 2026-10-04 11:04:54 +00:00
evidence.md Evidence claim 10 carries the 2/3 floor; cut-over runbook and morning summary point at the generator v2 packages 2026-10-04 08:08:48 +00:00
fork-divergence.md Docs: devnet-v4 integration section (merge order, devnet v4 rules, compatibility, cut-over commands) and bench-log entry 2026-10-04 01:23:42 +00:00
fork-map.md Finality quorum: 2/3 of active weight and at least 56.7% of total, per simulation v2 2026-10-03 16:15:15 +00:00
fud-fixes.md External review of the litepaper: response, 15 ledger entries, fix rows, open items, four-state rule, miner-app rules, phase-2 gate 2026-10-03 22:29:41 +00:00
fud-ledger.md Docs: ledger P12 fixed in the proving code and P20 fixed in the host; spec 7.6 shard statement definitions and the provisional S_p; benchmark standard rows 2026-10-04 10:10:17 +00:00
provenance.md Provenance: credit every borrowed component, upstream merge procedure, prover customer brief 2026-10-03 20:02:16 +00:00