igneum/docs
igneum-labs 1d018c601c Finality: the total-weight floor is two thirds (O-3.15 decided, 4 October 2026)
A lock needs two thirds of all 30-day weight signing; finality pauses
whenever less than two thirds is connected and signing, the chain runs
on proof of work meanwhile and the node reports it. Spec 3.3, 3.3.1,
3.7, 3.9, 3.10 Q3 row, 3.11 rewritten with the new arithmetic (safety
one third in every view, liveness two thirds connected, the per-view
window bound stated as 3.7 item 9); O-3.15 decided, O-3.16 closed,
O-3.18 and O-3.19 narrowed. Simulator: --floor, the +local partition
mode, scenario L; A to L re-run at the 2/3 floor over five seeds with
the 0.85 deltas in results_v2.md. Litepaper finality sentences and the
'does not claim' item. Ledger F2, F9, F16, F18 restated, F21 added
(the window bound and the post-heal finality fork from the devnet).
Bench-log: node build and tests, simulator deltas, three-node six-voter
runs of 6A, 6B and 6A with a long heal on ports 29200 and up.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-04 08:17:50 +00:00
..
analysis Difficulty: timestamp attack fixed in spec 2.3, simulator, analysis addendum, ledger M23 2026-10-04 00:56:20 +00:00
benchmarks Evidence page, end-to-end proving standard, funding plan, security-budget stress, payment routes 2026-10-03 22:35:03 +00:00
commercial Provenance: credit every borrowed component, upstream merge procedure, prover customer brief 2026-10-03 20:02:16 +00:00
design Execution: spec 7.5 pgas cap and abort rule, bench-log and ledger for the F-exec-A and F-exec-B fixes 2026-10-03 23:25:34 +00:00
legal Add the IGNEUM trade mark clearance search (3 Oct 2026) 2026-10-03 19:00:08 +00:00
plans Evidence claim 10 carries the 2/3 floor; cut-over runbook and morning summary point at the generator v2 packages 2026-10-04 08:08:48 +00:00
spec Finality: the total-weight floor is two thirds (O-3.15 decided, 4 October 2026) 2026-10-04 08:17:50 +00:00
bench-log.md Finality: the total-weight floor is two thirds (O-3.15 decided, 4 October 2026) 2026-10-04 08:17:50 +00:00
evidence.md Evidence claim 10 carries the 2/3 floor; cut-over runbook and morning summary point at the generator v2 packages 2026-10-04 08:08:48 +00:00
fork-divergence.md Docs: devnet-v4 integration section (merge order, devnet v4 rules, compatibility, cut-over commands) and bench-log entry 2026-10-04 01:23:42 +00:00
fork-map.md Finality quorum: 2/3 of active weight and at least 56.7% of total, per simulation v2 2026-10-03 16:15:15 +00:00
fud-fixes.md External review of the litepaper: response, 15 ledger entries, fix rows, open items, four-state rule, miner-app rules, phase-2 gate 2026-10-03 22:29:41 +00:00
fud-ledger.md Finality: the total-weight floor is two thirds (O-3.15 decided, 4 October 2026) 2026-10-04 08:17:50 +00:00
provenance.md Provenance: credit every borrowed component, upstream merge procedure, prover customer brief 2026-10-03 20:02:16 +00:00