| .. |
|
analysis
|
Difficulty: the live oscillation of 4 October, its cause, the DAG replay and rule v2 (reference window 600 behind a height switch)
|
2026-10-04 13:26:23 +00:00 |
|
benchmarks
|
Docs: ledger P12 fixed in the proving code and P20 fixed in the host; spec 7.6 shard statement definitions and the provisional S_p; benchmark standard rows
|
2026-10-04 10:10:17 +00:00 |
|
brand
|
Brand: before/after Finder renders of the app and DMG volume icons (docs/brand)
|
2026-10-04 11:51:11 +00:00 |
|
commercial
|
Provenance: credit every borrowed component, upstream merge procedure, prover customer brief
|
2026-10-03 20:02:16 +00:00 |
|
design
|
Live page: the ?window=300 capture with a paid shard cell and its tooltip; header counts and the ingest keep-window follow the target scale (the 8 px/s floor was the adaptive scale's); counts right on the first poll; lock label backed; record rotation 80 blocks per tick
|
2026-10-04 17:43:26 +00:00 |
|
legal
|
Add the IGNEUM trade mark clearance search (3 Oct 2026)
|
2026-10-03 19:00:08 +00:00 |
|
plans
|
Difficulty v2: Hetzner rehearsal passed (12 nodes, one chain through N + 600), binaries for every platform, the devnet rollout plan
|
2026-10-04 15:19:31 +00:00 |
|
spec
|
Proving v0: the app's prove setting, Proving tile and Set up hook; spec 7.7 (records, assignment, payout, activation as implemented); proving-v0 plan status; ledger P21 and P22; test script fixes
|
2026-10-04 14:09:32 +00:00 |
|
bench-log.md
|
Bench log: four-shard block proven on the RTX 5090 (run 3), save gap closed; first machine in the United States
|
2026-10-04 19:07:21 +00:00 |
|
bugs.md
|
Bug hunt: the site's Vercel project is in the igneum team (link, env and deploy commands in README-ship.md); bugs.md rows for the collect branch and the Vercel link, Sam's Mac closed
|
2026-10-04 19:20:32 +00:00 |
|
evidence.md
|
Bench log: shard proving on the RTX 5090 measured (10.9 s per shard, 2.2 s aggregation); evidence rows 15 and 16; journey line
|
2026-10-04 18:17:16 +00:00 |
|
fork-divergence.md
|
Docs: devnet-v4 integration section (merge order, devnet v4 rules, compatibility, cut-over commands) and bench-log entry
|
2026-10-04 01:23:42 +00:00 |
|
fork-map.md
|
Finality quorum: 2/3 of active weight and at least 56.7% of total, per simulation v2
|
2026-10-03 16:15:15 +00:00 |
|
fud-fixes.md
|
Review round 4 (4 October 2026, afternoon): what is live. 1 fatal, 16 serious, 8 minor, 1 fixed; ledger X18 to X30, G12 to G14, F23, F24, M25 to M29, E16, E17, L9; fixes rows 104 to 116
|
2026-10-04 18:05:28 +00:00 |
|
fud-ledger.md
|
Merge remote-tracking branch 'origin/review-round-4'
|
2026-10-04 18:15:02 +00:00 |
|
provenance.md
|
Provenance: credit every borrowed component, upstream merge procedure, prover customer brief
|
2026-10-03 20:02:16 +00:00 |