Commit graph

924 commits

Author SHA1 Message Date
igneum-labs
e313e7b791 Counter ASIC 3.0 item 2: the per-day item-derivation program (class dr736), its interpreter, emitter and packs
A prototype behind a new LoadClass field (derive_len) and Shape field, Shape::for_class_day: every mixer slot of
the item derivation runs a straight-line program of 736 instructions drawn from the day key stream (the same
SplitMix64 stream, after the 40 mixer draws), twelve two-register forms, the chain rule of SuperscalarHash made
strict (every instruction reads the register the previous one wrote), an acceptance test with the x8 mixer's
operation and multiply counts from the code as floors (72 x 144 as written, 72 x 128 hoisted, 1,152 multiplies).
The verifier runs the program with a word-major (SoA) interpreter over the 32 items of a load, dispatching on
instruction pairs; no JIT. The emitter writes mh_round_0..8 into memhard.h, memhard.metal and kernel.cl. Packs
dr736-genesis and dr736-devnet-epoch0 under proto-cuda/packs-ca3-derive. The v2 and v3 paths are untouched: every
pinned pack re-exports byte for byte (tests/packs.rs), cargo test -p igneum-pow 58 + 7 + 4 + 19 + 7 green.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:41:23 +00:00
igneum-labs
2542092b22 Merge branch 'master' into ca3-coord 2026-10-06 07:13:58 +00:00
igneum-labs
5aadaec8bc release 0.3.11: C35's cause on PC 1 and the ember-tune guard e600e63 in the next-cut list
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:03:10 +00:00
igneum-labs
bd93ae5023 Counter ASIC 2.0 status 07:03: PC 1 back, the 22:31Z quit source named (C35 closed), the Ember re-run on the project lead's word
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:02:44 +00:00
igneum-labs
66bc1784ef Counter ASIC 2.0: the crossing verdict PASS (05:21:48Z); H re-cut to about 19:12 to 19:20Z
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 05:58:24 +00:00
igneum-labs
dbddeba89c Counter ASIC 2.0: the coverage card counts corrected (47 mining / 18 chain mode / 6 proving-only)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:18:27 +00:00
igneum-labs
14c33be903 Counter ASIC 2.0: proving v1 segments confirmed from PC 2's log; decision 7 (segment length or cards) for the project lead
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:18:18 +00:00
igneum-labs
77495f88ad Counter ASIC 2.0: stamp 04:17 from the clock
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:17:13 +00:00
igneum-labs
eba1e419c6 Counter ASIC 2.0: proving v1's zero segments explained from prover.rs (coverage, not a fault); the morning line
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:17:08 +00:00
igneum-labs
cd66edfe04 Counter ASIC 2.0 status 04:17: proving v1 active with 0 segments proven (C47), the morning line
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:16:32 +00:00
igneum-labs
53a981b3f9 Counter ASIC 2.0 status 03:56: the crossing held (epoch 43 class v3 at DAA 154,814, 03:51:42Z); C46 on the next-cut list
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 03:55:26 +00:00
igneum-labs
ec20c5e19c Counter ASIC 2.0 status 01:34: the PC 2 chain closed (job 6's curve, the ledger suites, the job-runner finding)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:33:37 +00:00
igneum-labs
2d2414d450 Counter ASIC 2.0 status: stamp 01:13 from the clock
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:13:02 +00:00
igneum-labs
d82c15bfea Counter ASIC 2.0 status 01:16: the repro reading confirmed, the prover off on PC 2 since 00:49Z, job 5's parse failure
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:12:58 +00:00
igneum-labs
90fcb9411c Counter ASIC 2.0 rollout: PC job hygiene items (parse check, result writer, card-off confirmation) on the next-cut list
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:11:47 +00:00
igneum-labs
665bb9a3f7 Counter ASIC 2.0 status: heading stamped 01:10 from the clock
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:10:52 +00:00
igneum-labs
749f025f44 Counter ASIC 2.0 status 01:12: the repro run read as beside the miner, agg-cost-pc2-5 go
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:10:48 +00:00
igneum-labs
0f01a5d6f2 Counter ASIC 2.0 status 00:59: past DAA 144,000, N4 final, the queue state
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:59:27 +00:00
igneum-labs
2035fcf81c Counter ASIC 2.0 status: heading stamped 00:45 from the clock
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:45:34 +00:00
igneum-labs
0875f1d5c7 Counter ASIC 2.0 status 00:47: the M16 inline bench table, the repro run on PC 2
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:45:30 +00:00
igneum-labs
c23cbc8df6 Counter ASIC 2.0 rollout 6b: mine-and-prove measured beside the miner (sweep 4)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:38:58 +00:00
igneum-labs
371d3c09b5 Counter ASIC 2.0 status 00:40: the mine-and-prove reading corrected to the 600 DAA-s deadline rule
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:38:49 +00:00
igneum-labs
31abee4bb0 Counter ASIC 2.0 status 00:40: floor-sweep-4 rows (mine-and-prove beside the miner), M16 go
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:38:33 +00:00
igneum-labs
887aeb7690 Counter ASIC 2.0: the crossing watcher (infra/devnet/crossing-watch.mjs) armed for N4 = 154,800; status 00:36
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:35:45 +00:00
igneum-labs
4d815edea5 Counter ASIC 2.0 status: the 00:28 and 00:29 headings stamped from the clock (were guessed ahead)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:29:39 +00:00
igneum-labs
d8244a9961 Counter ASIC 2.0: the M20 era test fails on 89dfcb95 under igneum-pow; G6 caveat (suites ran without the feature)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:29:21 +00:00
igneum-labs
104d6350ec Counter ASIC 2.0 status 00:36: the 0.3.12 list with the paid_wei fix first, the settings.json rule for PC 2 playbooks
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:28:40 +00:00
igneum-labs
2ced7f73b8 Counter ASIC 2.0 rollout: the empty /api/state cause is paid_wei u128; 0.3.12 app cut recommended for the morning
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:28:15 +00:00
igneum-labs
979805dc0d Counter ASIC 2.0 rollout: the app's empty /api/state (non-finite float) on the next-cut list
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:25:00 +00:00
igneum-labs
8b34edddf6 Counter ASIC 2.0 status 00:24: job 4 void, sweep 4 running, the M20 era test finding
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:23:08 +00:00
igneum-labs
2dadd0da06 Counter ASIC 2.0: shard labels corrected (adopted = the v1 shard, prototype = block-338-shard1)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:18:50 +00:00
igneum-labs
1dd466d580 Counter ASIC 2.0 rollout 8: master CI green
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:18:19 +00:00
igneum-labs
b4b5a2af92 Counter ASIC 2.0 rollout 6b: the 12 GB tier measured on patch v3 (2^26 threshold, 10,291 MiB at 5.7 s)
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:18:14 +00:00
igneum-labs
006aef4fe5 Counter ASIC 2.0 status 00:20: floor-sweep-3 nine rows, the aggregation-cost re-run go
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:17:53 +00:00
igneum-labs
e8a5f8c2c0 Counter ASIC 2.0 rollout 8: shipped, the two publishes, the digest sweep, what is not yet on 0.3.11
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:15:20 +00:00
igneum-labs
df8fdbf1c9 Counter ASIC 2.0 status 00:18: 0.3.11 shipped, master fa8193b and 7d779c7, the sweep closed
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:15:02 +00:00
igneum-labs
c6dceb9dd5 Counter ASIC 2.0 rollout: the explorer split (f20803e safe, 525ad82 waits) on the next-cut list
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:14:40 +00:00
igneum-labs
7d779c76d3 release 0.3.11: the plan's merge and push section
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:14:19 +00:00
igneum-labs
e4196a6d6d Counter ASIC 2.0 rollout: C43 miner resubscription and the update-now queue on the next-cut list
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:12:23 +00:00
igneum-labs
7f70e91c99 release 0.3.11: the plan's step 2, the digest sweep and the open items; sections in order
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:12:23 +00:00
igneum-labs
23bfc327aa Counter ASIC 2.0 status 00:09: publish 2 on the nodes at 0139ab9d, the floor build go
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:09:20 +00:00
igneum-labs
535b5387dd Counter ASIC 2.0 status 23:58: the panic's arithmetic corrected from the agent's reading
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:59:48 +00:00
igneum-labs
a041f8ab97 Counter ASIC 2.0 status 23:58: the v2 server's tracegen panic, PC 2 clear for publish 2
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:57:50 +00:00
igneum-labs
b7cbfc11ce release-0.3.11 plan: the push and both CI runs, step 1 (the hand nodes and the seed at 4d8f8bb6, the manifest with the override carried over, the Mac, PC 2 and its epoch-boundary recovery, the stall and the Mac's resume, the laptop), the next-cut list
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:56:46 +00:00
igneum-labs
8fa128c137 Counter ASIC 2.0 status 23:57: PC 2 on 0.3.11, publish 2 go, N4 stands
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:56:45 +00:00
igneum-labs
91e35074db Counter ASIC 2.0 status 23:47: the update queues behind the sweep's cap, no relay task
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:44:59 +00:00
igneum-labs
f23b8aefed Counter ASIC 2.0 rollout: 7d the step-1 stall and the slipped times, the prover memory tiers
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:43:36 +00:00
igneum-labs
d34a3acb17 Counter ASIC 2.0 status 23:40: PC 2 clear, sweep 2 hung on point 1, the new-side stall
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:39:53 +00:00
igneum-labs
e3a2b75db2 Counter ASIC 2.0 rollout: C41 HiveOS local mode on the next-cut list, the tier line
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:32:37 +00:00
igneum-labs
81701d53ff Counter ASIC 2.0 status 23:32: publish 1 live at 4d8f8bb6, PC 2 updates when the sweep closes
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:31:44 +00:00