Counter ASIC 3.0 items 4 and 5: the issuance trigger, the signal trigger, the FPGA lane and the layer 9 against layer 7 ranking
...
docs/plans/funding.md rule 5: the bounty is escrowed and the benchmark live before daily
issuance crosses USD 20,000 a day, with the price-per-IGN table per halving period.
docs/plans/epoch-length.md section 11: the detector alert held 6 net windows recommends
the next shorter ladder step, per-tier costs at 2,400 and 600, the adversary's share per
compile class. Section 12: HBM FPGA parts with sources, reads in flight per watt against
the RTX 5090 (0.3x to 0.4x at Shuhai's measured rate, up to 1.9x at the unmeasured bank
ceiling), the two FPGA lanes in one table, and the ranking: layer 9 above layer 7.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:47:21 +00:00
igneum-labs
7f76308ff8
Counter ASIC 3.0 status: item 6's Mac step costs (interim)
2026-10-06 07:36:58 +00:00
igneum-labs
4ab969d182
Counter ASIC 3.0 status: the two claim drafts for the project lead with the rows that bound them (main's steering)
2026-10-06 07:35:09 +00:00
igneum-labs
216a4b90c3
Counter ASIC 3.0 status: item 1 closed (verdict over 2x, the f = 1 chip), item 8 (latency-shadow program work) opened
2026-10-06 07:33:26 +00:00
igneum-labs
7b32a4e80b
Merge branch 'ca3-analysis' into ca3-coord
2026-10-06 07:32:18 +00:00
igneum-labs
6039ae8d9e
Counter ASIC 3.0 item 1: the partial-store chip and the time-memory curve in chip-model-v3.md section 5
...
f = 0, 0.25, 0.5, 0.75, 1 on GDDR7 (the 5090's board), one HBM3 stack and eight HBM3 stacks, scored in energy per
hash, reads in flight per watt, rate per chip and dollars per MH/s against the RTX 5090 at 136.1 MH/s and 326 W.
The curve is monotone toward f = 1; the f = 1 chip reads 5.1x (GDDR7) to 9.2x (HBM3) per joule in the model and
2.1x to 4.8x by the Ethash precedent: over 2x. The mixer and item 2 do not touch it; the levers named are the
5090's watts under a power cap (a PC 2 job, owed) and program work in the latency shadow. Inputs cited with URLs
read 6 October 2026; the mixer counted from memhard.rs at 128 hoisted / 144 unhoisted ops per application.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:32:00 +00:00
igneum-labs
188aeed9ec
Counter ASIC 3.0: mixer_mult = 8 in spec 1.13.1 and mixer-x4.md section 2 (item 3's finding); item 3 closed in the status file
2026-10-06 07:31:02 +00:00
igneum-labs
265749d557
Merge branch 'ca3-crypto-brief' into ca3-coord
2026-10-06 07:30:42 +00:00
igneum-labs
013ec52445
Counter ASIC 3.0 item 3: the mixer cryptanalysis line item and brief in funding.md
...
One row in the funding table (USD 80,000 to 160,000 for two independent reviews, basis the four RandomX reviews of 2019 at their published per-firm prices and person-days) and a section "The mixer cryptanalysis brief (Counter ASIC 3.0 item 3)": the target shape from memhard.rs and accept.rs, the ranked break list with the chip-model number each moves, deliverables and timebox, the soundness suite to re-run, acceptance criteria in the RandomX audit style, candidate reviewers with citations, the risk column against the two-publish rollout, the timing against the testnet go checklist, and the consequences per user tier. Nothing else in the file is touched.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:29:45 +00:00
igneum-labs
1a3c440977
Counter ASIC 3.0 status: the run opened 07:3x UTC, machines and rules, five workers
2026-10-06 07:20:17 +00:00
igneum-labs
ac2bca8a0a
Merge branch 'master' into ca3-coord
2026-10-06 07:13:58 +00:00
igneum-labs
f8088c49c3
release 0.3.11: C35's cause on PC 1 and the ember-tune guard e600e63 in the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:03:10 +00:00
igneum-labs
2429aeef08
Counter ASIC 2.0 status 07:03: PC 1 back, the 22:31Z quit source named (C35 closed), the Ember re-run on the project lead's word
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:02:44 +00:00
igneum-labs
037cb780d7
Counter ASIC 2.0: the crossing verdict PASS (05:21:48Z); H re-cut to about 19:12 to 19:20Z
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 05:58:24 +00:00
igneum-labs
ac4a88ce03
Counter ASIC 2.0: the coverage card counts corrected (47 mining / 18 chain mode / 6 proving-only)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:18:27 +00:00
igneum-labs
b438e10e1c
Counter ASIC 2.0: proving v1 segments confirmed from PC 2's log; decision 7 (segment length or cards) for the project lead
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:18:18 +00:00
igneum-labs
9268c5a391
Counter ASIC 2.0: stamp 04:17 from the clock
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:17:13 +00:00
igneum-labs
7321d1fb45
Counter ASIC 2.0: proving v1's zero segments explained from prover.rs (coverage, not a fault); the morning line
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:17:08 +00:00
igneum-labs
0678ae05d5
Counter ASIC 2.0 status 04:17: proving v1 active with 0 segments proven (C47), the morning line
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:16:32 +00:00
igneum-labs
6cca0c4cab
Counter ASIC 2.0 status 03:56: the crossing held (epoch 43 class v3 at DAA 154,814, 03:51:42Z); C46 on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 03:55:26 +00:00
igneum-labs
9632d78921
Counter ASIC 2.0 status 01:34: the PC 2 chain closed (job 6's curve, the ledger suites, the job-runner finding)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:33:37 +00:00
igneum-labs
37f53c067a
Counter ASIC 2.0 status: stamp 01:13 from the clock
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:13:02 +00:00
igneum-labs
ea6f946587
Counter ASIC 2.0 status 01:16: the repro reading confirmed, the prover off on PC 2 since 00:49Z, job 5's parse failure
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:12:58 +00:00
igneum-labs
bdf4237b23
Counter ASIC 2.0 rollout: PC job hygiene items (parse check, result writer, card-off confirmation) on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:11:47 +00:00
igneum-labs
84e709cf48
Counter ASIC 2.0 status: heading stamped 01:10 from the clock
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:10:52 +00:00
igneum-labs
02ab3d94d6
Counter ASIC 2.0 status 01:12: the repro run read as beside the miner, agg-cost-pc2-5 go
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:10:48 +00:00
igneum-labs
aae4dbc45b
Counter ASIC 2.0 status 00:59: past DAA 144,000, N4 final, the queue state
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:59:27 +00:00
igneum-labs
84393fb1b2
Counter ASIC 2.0 status: heading stamped 00:45 from the clock
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:45:34 +00:00
igneum-labs
724bd5aa00
Counter ASIC 2.0 status 00:47: the M16 inline bench table, the repro run on PC 2
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:45:30 +00:00
igneum-labs
a87db8d3e1
Counter ASIC 2.0 rollout 6b: mine-and-prove measured beside the miner (sweep 4)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:38:58 +00:00
igneum-labs
b33d33a0a9
Counter ASIC 2.0 status 00:40: the mine-and-prove reading corrected to the 600 DAA-s deadline rule
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:38:49 +00:00
igneum-labs
43c2951867
Counter ASIC 2.0 status 00:40: floor-sweep-4 rows (mine-and-prove beside the miner), M16 go
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:38:33 +00:00
igneum-labs
38a78419ac
Counter ASIC 2.0: the crossing watcher (infra/devnet/crossing-watch.mjs) armed for N4 = 154,800; status 00:36
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:35:45 +00:00
igneum-labs
897ec73186
Counter ASIC 2.0 status: the 00:28 and 00:29 headings stamped from the clock (were guessed ahead)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:29:39 +00:00
igneum-labs
250a7d1ebe
Counter ASIC 2.0: the M20 era test fails on 89dfcb95 under igneum-pow; G6 caveat (suites ran without the feature)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:29:21 +00:00
igneum-labs
449329dea0
Counter ASIC 2.0 status 00:36: the 0.3.12 list with the paid_wei fix first, the settings.json rule for PC 2 playbooks
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:28:40 +00:00
igneum-labs
bea41cf4ab
Counter ASIC 2.0 rollout: the empty /api/state cause is paid_wei u128; 0.3.12 app cut recommended for the morning
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:28:15 +00:00
igneum-labs
350d875903
Counter ASIC 2.0 rollout: the app's empty /api/state (non-finite float) on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:25:00 +00:00
igneum-labs
8fff2ac261
Counter ASIC 2.0 status 00:24: job 4 void, sweep 4 running, the M20 era test finding
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:23:08 +00:00
igneum-labs
c547a1ff4a
Counter ASIC 2.0: shard labels corrected (adopted = the v1 shard, prototype = block-338-shard1)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:18:50 +00:00
igneum-labs
7fdea00b20
Counter ASIC 2.0 rollout 8: master CI green
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:18:19 +00:00
igneum-labs
43a3b354ea
Counter ASIC 2.0 rollout 6b: the 12 GB tier measured on patch v3 (2^26 threshold, 10,291 MiB at 5.7 s)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:18:14 +00:00
igneum-labs
67fd440001
Counter ASIC 2.0 status 00:20: floor-sweep-3 nine rows, the aggregation-cost re-run go
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:17:53 +00:00
igneum-labs
d721048b31
Counter ASIC 2.0 rollout 8: shipped, the two publishes, the digest sweep, what is not yet on 0.3.11
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:15:20 +00:00
igneum-labs
0afe36c371
Counter ASIC 2.0 status 00:18: 0.3.11 shipped, master fa8193b and 18de437, the sweep closed
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:15:02 +00:00
igneum-labs
8716747934
Counter ASIC 2.0 rollout: the explorer split ( 894fe08 safe, 303038a waits) on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:14:40 +00:00
igneum-labs
18de437605
release 0.3.11: the plan's merge and push section
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:14:19 +00:00
igneum-labs
c2462ab2f4
Counter ASIC 2.0 rollout: C43 miner resubscription and the update-now queue on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:12:23 +00:00
igneum-labs
d61ce0ccee
release 0.3.11: the plan's step 2, the digest sweep and the open items; sections in order
...