Open: P3 to Answered by design (the measurement named: a wrapped segment proof on a 12 GB and a 24 GB card verified on a phone, the proving lane, the phase 2 benchmark); L5 to Answered with evidence (the clearance search of 3 October 2026 is in docs/legal/trademark-search-2026-10-03.md, one verdict per register); X15 to Answered by design (O-X.2 named on the public testnet, the testnet lane, inside its first month); P22 to Answered by design (spec 7.7 item 6 and the native veto contain it; the consensus proof of design 7 in phase 2 makes the rewards outputs); L1, L2 and L4 stay Open with the one sentence each that only the founder's decision with counsel answers. Other: M34, C2, X34 and X35's first status lines lead with Conceded or Fixed; tools/ledger-page.mjs takes the LAST status line of an entry (the export's rule), which is why the page counted four entries as Other that docs/ledger-public.md did not. The Counter ASIC lane's closing lines for X35, X36 and AP-F8-1 written in with its words and the commits named, and a new row X37 for the class v4 energy premium (Answered with evidence, 82 W at the 5090's knee). docs/ledger-public.md regenerated: 191 items, Open 3, Other 0.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>