External review of the litepaper: response, 15 ledger entries, fix rows, open items, four-state rule, miner-app rules, phase-2 gate
docs/review/external-2026-10-03.md holds the reviewer's text verbatim and the
classification: 13 already answered, 15 new, 1 wrong. New ledger entries M22,
F19, F20, P16, P17, E12, E13, E14, E15, G11, X13, X14, X15, X16, X17 with
cross-references on M1, P1, E1, G6, X1, X5, F16. fud-fixes rows 89 to 103.
Open items O-3.15, O-3.16, O-5.9 to O-5.11, O-7.1, O-7.2, O-8.2, O-8.3,
O-X.1 to O-X.3 (count 73). Execution layer 2.4: included, executed, proven,
finalised. Phone app 4.1: net earnings after tariff, two incomes, failed jobs,
release state, isolation. journey.json phase-2 gate: fixed workload, end to
end, no growing backlog, three independent reproductions.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>