docs/review/external-2026-10-03.md holds the reviewer's text verbatim and the classification: 13 already answered, 15 new, 1 wrong. New ledger entries M22, F19, F20, P16, P17, E12, E13, E14, E15, G11, X13, X14, X15, X16, X17 with cross-references on M1, P1, E1, G6, X1, X5, F16. fud-fixes rows 89 to 103. Open items O-3.15, O-3.16, O-5.9 to O-5.11, O-7.1, O-7.2, O-8.2, O-8.3, O-X.1 to O-X.3 (count 73). Execution layer 2.4: included, executed, proven, finalised. Phone app 4.1: net earnings after tariff, two incomes, failed jobs, release state, isolation. journey.json phase-2 gate: fixed workload, end to end, no growing backlog, three independent reproductions. Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
110 lines
3.8 KiB
JSON
110 lines
3.8 KiB
JSON
{
|
|
"updated": "2026-10-03",
|
|
"stage": "phase-3",
|
|
"phases": [
|
|
{
|
|
"id": "phase-1",
|
|
"name": "Specification",
|
|
"when": "Oct to Nov 2026",
|
|
"status": "active",
|
|
"line": "Mining generator, shard proving, finality rules, written for external review"
|
|
},
|
|
{
|
|
"id": "phase-2",
|
|
"name": "Prove the proving",
|
|
"when": "Nov 2026 to Jan 2027",
|
|
"status": "active",
|
|
"line": "Mining program proven on Apple, NVIDIA and AMD; shard proving benchmark on consumer cards still to run",
|
|
"gate": "A fixed published workload, job received to accepted proof on a declared consumer card, sustained with no growing backlog, reproduced by three independent operators"
|
|
},
|
|
{
|
|
"id": "phase-3",
|
|
"name": "Devnet",
|
|
"when": "Started 3 Oct 2026, 20 nodes by Mar 2027",
|
|
"status": "active",
|
|
"line": "BlockDAG node mining on the new program, GPU miners on three vendors, EVM execution in build",
|
|
"gate": "1 block a second held with proofs under 60 s behind the tip"
|
|
},
|
|
{
|
|
"id": "phase-4",
|
|
"name": "Finality and job market",
|
|
"when": "Apr to Jul 2027",
|
|
"status": "next",
|
|
"line": "Sustained-mining finality, external proving jobs, miner client with auto-switching",
|
|
"gate": "Finality design passes external review and one rollup signs for testnet"
|
|
},
|
|
{
|
|
"id": "phase-5",
|
|
"name": "Public testnet",
|
|
"when": "Aug to Oct 2027",
|
|
"status": "next",
|
|
"line": "One-click miner app on Windows, macOS and Linux, HiveOS, pools, the first rollup as a proving customer, no coin yet",
|
|
"gate": "1,000 independent miners run 30 days and rollup proofs are delivered on time"
|
|
},
|
|
{
|
|
"id": "phase-6",
|
|
"name": "Mainnet fair launch",
|
|
"when": "Nov 2027",
|
|
"status": "next",
|
|
"line": "Genesis with no premine, 30-day ramp, exchange listings after"
|
|
}
|
|
],
|
|
"log": [
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "Devnet started four months ahead of plan. Finality, the EVM layer and the Igneum difficulty controller are in build."
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "First blocks mined over the network from a Windows PC: an RTX 5090 and an AMD chip, 16 identities, with the live devnet page drawing every block."
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "First devnet blocks on the real lottery hash: CPU, then Metal GPU, three worker implementations"
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "Igneum-node devnet v0: 3-node igneum-devnet at 1 BPS with the 80/20 coinbase and vote_key_hash"
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "Proto-opencl: OpenCL path built and proven without AMD silicon"
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "AMD gfx1036 , AMD OpenCL 2.1 driver 3652.0"
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "RTX 5090 through NVIDIA OpenCL"
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "RTX 5090 first run"
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "RTX 5090, memory-hard dataset"
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "RTX 5090 ran two generated programs and matched the Apple M5 Max hash for hash, 192 of 192. Vendor independence measured on two vendors."
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "Fuzzing: 10,200 random programs, 1.3 million hashes, zero GPU to CPU mismatches on Apple silicon."
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "Second hostile review of the finality rule. Two fatal flaws found and fixed. Rule version 2 published in the design doc."
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "First prototype of the random-program lottery hash ran on an Apple M5 Max. GPU and CPU agreed bit for bit."
|
|
},
|
|
{
|
|
"date": "2026-10-03",
|
|
"text": "Igneum named. Litepaper, brand and wallet designs published."
|
|
}
|
|
]
|
|
}
|