igneum/site/img/app-overview-mac-light.webp
igneum-labs 583eeea437 site: light-theme app captures, the X9 withdrawal correction (ledger X36), the Discord vanity link
Light theme shows light screenshots on the miner and app pages (the
0.3.16 renders from the RTX 5090 Windows rig's live state, the 390 px
pair included). The X9 never shipped: pre-orders 26 December 2025,
withdrawn mid-May 2026 before any unit shipped, no benchmark; every
public sentence that had it shipping now says so, with k about 0.33
labelled as the claimed, unmeasured core; ledger X36, notes on X34, X35,
M34 and C2. Every public Discord link is https://discord.gg/igneum.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-07 08:01:03 +00:00

77 KiB
1440x1259px