Commit graph

9 commits

Author SHA1 Message Date
igneum-labs
c9daf50004 C29 and D11: the verifier line on the fixed crate, the bounty struck until escrowed, the final-class rates in the public tables; status 22:25 2026-10-05 22:25:02 +00:00
igneum-labs
4f75b7cdfb Site and litepaper: level 1 on the hero and abstract, the chip bullet on the measured row; the level 3 table filled; status 22:18 2026-10-05 22:18:39 +00:00
igneum-labs
10421ff814 Counter ASIC 2.0: the iGPU restart-per-epoch statement, dataset reuse on the next-cut list, the gate's script fix; status 21:32 2026-10-05 21:32:35 +00:00
igneum-labs
6386291e32 Counter ASIC 2.0: C18 per-pound correction struck everywhere, C19 and C20 routed 2026-10-05 20:41:50 +00:00
igneum-labs
cafb38c3e5 Counter ASIC 2.0: layers 1, 2, 3 decided from the readwidth table, layer 5 Mac rows and the added-form redesign, user tiers, public level 2 edit 2026-10-05 20:27:01 +00:00
igneum-labs
3f67b31280 Counter ASIC 2.0: the mixer x4 decision into v3, ca2-mixer agent, status 22:00 2026-10-05 20:27:01 +00:00
igneum-labs
76df7f7c91 Counter ASIC 2.0: layer 3 decided (scratch share 0, chip 2.4x at every share), the claim qualified, public level 3 headline 2026-10-05 20:27:01 +00:00
igneum-labs
2144eefa3d Counter ASIC 2.0: the shipped-density correction to the SRAM mirror (130 to 165 mm^2), carried into the rollout and public docs 2026-10-05 20:27:01 +00:00
igneum-labs
d061ab5c06 Counter ASIC: the public description in four levels (levels 1 and 2 as copy, 3 and 4 with owed markers) 2026-10-05 20:27:01 +00:00