igneum-labs
bb9dff0f07
Counter ASIC 3.0 item 3: the mixer cryptanalysis line item and brief in funding.md
...
One row in the funding table (USD 80,000 to 160,000 for two independent reviews, basis the four RandomX reviews of 2019 at their published per-firm prices and person-days) and a section "The mixer cryptanalysis brief (Counter ASIC 3.0 item 3)": the target shape from memhard.rs and accept.rs, the ranked break list with the chip-model number each moves, deliverables and timebox, the soundness suite to re-run, acceptance criteria in the RandomX audit style, candidate reviewers with citations, the risk column against the two-publish rollout, the timing against the testnet go checklist, and the consequences per user tier. Nothing else in the file is touched.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:29:45 +00:00
igneum-labs
6276740480
Merge branch 'master' into ca3-coord
2026-10-06 07:13:58 +00:00
igneum-labs
6a27d5ab7d
release 0.3.11: C35's cause on PC 1 and the ember-tune guard e600e63 in the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:03:10 +00:00
igneum-labs
c71410c547
Counter ASIC 2.0 status 07:03: PC 1 back, the 22:31Z quit source named (C35 closed), the Ember re-run on the project lead's word
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 07:02:44 +00:00
igneum-labs
3e254d27bf
Counter ASIC 2.0: the crossing verdict PASS (05:21:48Z); H re-cut to about 19:12 to 19:20Z
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 05:58:24 +00:00
igneum-labs
1eff2b594c
Counter ASIC 2.0: the coverage card counts corrected (47 mining / 18 chain mode / 6 proving-only)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:18:27 +00:00
igneum-labs
9bc9590288
Counter ASIC 2.0: proving v1 segments confirmed from PC 2's log; decision 7 (segment length or cards) for the project lead
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:18:18 +00:00
igneum-labs
ac63ea418d
Counter ASIC 2.0: stamp 04:17 from the clock
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:17:13 +00:00
igneum-labs
018288b8be
Counter ASIC 2.0: proving v1's zero segments explained from prover.rs (coverage, not a fault); the morning line
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:17:08 +00:00
igneum-labs
a63314c2b8
Counter ASIC 2.0 status 04:17: proving v1 active with 0 segments proven (C47), the morning line
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 04:16:32 +00:00
igneum-labs
fd47d3fd6a
Counter ASIC 2.0 status 03:56: the crossing held (epoch 43 class v3 at DAA 154,814, 03:51:42Z); C46 on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 03:55:26 +00:00
igneum-labs
13cbeeea18
Counter ASIC 2.0 status 01:34: the PC 2 chain closed (job 6's curve, the ledger suites, the job-runner finding)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:33:37 +00:00
igneum-labs
015936bf01
Counter ASIC 2.0 status: stamp 01:13 from the clock
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:13:02 +00:00
igneum-labs
dce3322a22
Counter ASIC 2.0 status 01:16: the repro reading confirmed, the prover off on PC 2 since 00:49Z, job 5's parse failure
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:12:58 +00:00
igneum-labs
965029c6db
Counter ASIC 2.0 rollout: PC job hygiene items (parse check, result writer, card-off confirmation) on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:11:47 +00:00
igneum-labs
52472980d5
Counter ASIC 2.0 status: heading stamped 01:10 from the clock
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:10:52 +00:00
igneum-labs
aad93aaae5
Counter ASIC 2.0 status 01:12: the repro run read as beside the miner, agg-cost-pc2-5 go
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 01:10:48 +00:00
igneum-labs
4c731a6bf5
Counter ASIC 2.0 status 00:59: past DAA 144,000, N4 final, the queue state
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:59:27 +00:00
igneum-labs
ce64918008
Counter ASIC 2.0 status: heading stamped 00:45 from the clock
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:45:34 +00:00
igneum-labs
26cc135335
Counter ASIC 2.0 status 00:47: the M16 inline bench table, the repro run on PC 2
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:45:30 +00:00
igneum-labs
27845b1030
Counter ASIC 2.0 rollout 6b: mine-and-prove measured beside the miner (sweep 4)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:38:58 +00:00
igneum-labs
4cb4e887b0
Counter ASIC 2.0 status 00:40: the mine-and-prove reading corrected to the 600 DAA-s deadline rule
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:38:49 +00:00
igneum-labs
d8d6fcd463
Counter ASIC 2.0 status 00:40: floor-sweep-4 rows (mine-and-prove beside the miner), M16 go
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:38:33 +00:00
igneum-labs
4082d854b8
Counter ASIC 2.0: the crossing watcher (infra/devnet/crossing-watch.mjs) armed for N4 = 154,800; status 00:36
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:35:45 +00:00
igneum-labs
4de35e19d8
Counter ASIC 2.0 status: the 00:28 and 00:29 headings stamped from the clock (were guessed ahead)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:29:39 +00:00
igneum-labs
fe3dd09567
Counter ASIC 2.0: the M20 era test fails on 89dfcb95 under igneum-pow; G6 caveat (suites ran without the feature)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:29:21 +00:00
igneum-labs
be648ffa73
Counter ASIC 2.0 status 00:36: the 0.3.12 list with the paid_wei fix first, the settings.json rule for PC 2 playbooks
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:28:40 +00:00
igneum-labs
105cb9ff40
Counter ASIC 2.0 rollout: the empty /api/state cause is paid_wei u128; 0.3.12 app cut recommended for the morning
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:28:15 +00:00
igneum-labs
b79a664592
Counter ASIC 2.0 rollout: the app's empty /api/state (non-finite float) on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:25:00 +00:00
igneum-labs
97f04923a5
Counter ASIC 2.0 status 00:24: job 4 void, sweep 4 running, the M20 era test finding
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:23:08 +00:00
igneum-labs
fa5f206bf0
Counter ASIC 2.0: shard labels corrected (adopted = the v1 shard, prototype = block-338-shard1)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:18:50 +00:00
igneum-labs
6978389fa9
Counter ASIC 2.0 rollout 8: master CI green
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:18:19 +00:00
igneum-labs
593350c1b9
Counter ASIC 2.0 rollout 6b: the 12 GB tier measured on patch v3 (2^26 threshold, 10,291 MiB at 5.7 s)
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:18:14 +00:00
igneum-labs
dd8b9b6e05
Counter ASIC 2.0 status 00:20: floor-sweep-3 nine rows, the aggregation-cost re-run go
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:17:53 +00:00
igneum-labs
a41acf4389
Counter ASIC 2.0 rollout 8: shipped, the two publishes, the digest sweep, what is not yet on 0.3.11
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:15:20 +00:00
igneum-labs
fcfc47786f
Counter ASIC 2.0 status 00:18: 0.3.11 shipped, master fa8193b and dd0c085, the sweep closed
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:15:02 +00:00
igneum-labs
5946931b9d
Counter ASIC 2.0 rollout: the explorer split ( 02b8329 safe, 1e1435a waits) on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:14:40 +00:00
igneum-labs
dd0c08515f
release 0.3.11: the plan's merge and push section
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:14:19 +00:00
igneum-labs
9b635c6018
Counter ASIC 2.0 rollout: C43 miner resubscription and the update-now queue on the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:12:23 +00:00
igneum-labs
048d50ab89
release 0.3.11: the plan's step 2, the digest sweep and the open items; sections in order
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:12:23 +00:00
igneum-labs
2008ff4af8
Counter ASIC 2.0 status 00:09: publish 2 on the nodes at 0139ab9d, the floor build go
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 00:09:20 +00:00
igneum-labs
7dd7b0660d
Counter ASIC 2.0 status 23:58: the panic's arithmetic corrected from the agent's reading
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:59:48 +00:00
igneum-labs
2328b2e976
Counter ASIC 2.0 status 23:58: the v2 server's tracegen panic, PC 2 clear for publish 2
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:57:50 +00:00
igneum-labs
a9bfa3f3e2
release-0.3.11 plan: the push and both CI runs, step 1 (the hand nodes and the seed at 4d8f8bb6, the manifest with the override carried over, the Mac, PC 2 and its epoch-boundary recovery, the stall and the Mac's resume, the laptop), the next-cut list
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:56:46 +00:00
igneum-labs
328adf05a1
Counter ASIC 2.0 status 23:57: PC 2 on 0.3.11, publish 2 go, N4 stands
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:56:45 +00:00
igneum-labs
329c6c10ab
Counter ASIC 2.0 status 23:47: the update queues behind the sweep's cap, no relay task
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:44:59 +00:00
igneum-labs
a7a4d41fc4
Counter ASIC 2.0 rollout: 7d the step-1 stall and the slipped times, the prover memory tiers
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:43:36 +00:00
igneum-labs
698512bf75
Counter ASIC 2.0 status 23:40: PC 2 clear, sweep 2 hung on point 1, the new-side stall
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:39:53 +00:00
igneum-labs
b88c4f7797
Counter ASIC 2.0 rollout: C41 HiveOS local mode on the next-cut list, the tier line
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:32:37 +00:00
igneum-labs
3eac4bd352
Counter ASIC 2.0 status 23:32: publish 1 live at 4d8f8bb6, PC 2 updates when the sweep closes
...
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-05 23:31:44 +00:00