The adv-accept harness crate (draw-path check, accepted-program sweep over class v4,
closed-form distinct and per-site ratio, plant hooks), the box-2 run script, and the
Deliverable-2 report with the status board. Draw path validated (shared devnet epoch-0
id a785001687d8688a). The plant fires on (a'). The 10k-seed sweep is running on box 2.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>