igneum-labs
|
560b6f78b6
|
ca2-epoch: docs/plans/epoch-length.md, the epoch length as a signalled era parameter (layer 9): day-anchored ladder 600 to 7,200, signal-only with the draw slot consumed, lead and T_epoch fixed (option A), the difficulty-settle constraint, the FPGA compile-time threat with citations, the per-card compile-ahead table and the 600-s floor (Mac rows pending the measurement), consequences per tier, spec text for 1.12, 1.13.1 and 4.3, owed list
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
|
2026-10-05 20:44:45 +00:00 |
|