- 03-finality: Q2 participation from every vote seen in blocks (votes are
block payload); 3.3.2 the eclipse case closed by the 56.7% floor with the
sim v2 F2 numbers; 3.4.1 why aggregators cannot grind participation.
- 07-execution (new): EVM semantics on the DAG, shard sortition (8 provers,
10 s, then open, no shard bond), bridges (none official, no bridged
stablecoins at genesis, proof bridge with the consensus proof in phase two).
- 08-client-security (new): reproducible builds, release key in genesis and
in hardware, no silent updates, consensus only by 90% signalling, notarised
builds, official sources with the hash, seed confirmed before mining,
hardware wallet, the permanent seed line.
- 00, 02, 05, README, 06: cross-references, O-2.8 removed, O-3.3, O-3.7,
O-5.1, O-5.2, O-5.6 narrowed, O-8.1 added, counts kept at 60.
- Ledger: eight Status lines, status table, count table, overclaims 38, 40, 71.
- FUD fixes: rows 23, 26, 38, 62, 64, 66, 67, 70, 72, section 3 and 4.
- Site: bridge and stablecoin sentences no longer launch features; the seed
line wherever the app appears.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
Decision of 3 October 2026: no fee to any team, foundation or fund.
Priority fee now splits 80% to the miners and provers of the block and
20% to the application called, attributed per call frame as before.
No burn of the tip; the base fee is still burned in full on both gas
dimensions. External proving jobs pay 90% to the provers who delivered
and burn 10%. The 60% signalling mechanism stays as a general tool for
parameters that genesis rules leave to miners; upgrades stay at 90%.
Ledger E4 closed by removal; E3, E5, G4, G5, G8, L1 and overclaims
45, 46 and 53 rewritten to the new rule.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
docs/spec/01 to 06 and the README index, alongside the existing overview. Section 1 is the normative
definition of the lottery hash with test vectors copied from the igneum-genesis-mh pack (cache fingerprint
48c4f5bf24166b2e, 96 hashes, mixer constants) and every prototype value marked with the measurement that
fixes it at gate 1. Sections 2 to 5 are the design as decided on 3 October 2026, labelled Designed. Section 6
lists 60 open items with the experiment or decision that closes each and its gate.
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>