igneum-labs
|
e6a3f8bab1
|
FUD sweep round 6 (evening, 5 October): eleven rolled-out fixes moved to Fixed with live measurement lines, F21/F22 shipped but switch not thrown, M20 closed on the 0.3.5 merge; P14 one base-fee definition in spec 05; M16 recompute-attacker cost model; C4 overlay-against-GHOSTDAG runner
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
|
2026-10-05 16:02:02 +00:00 |
|