Commit graph

217 commits

Author SHA1 Message Date
igneum-josh
4b2fb8dc7f Counter ASIC 2.0 status 22:50: the 20:01Z early update on PC 2, the quit order 2026-10-05 22:50:04 +00:00
igneum-josh
cb08210026 Rollout plan: N4 = N5 = 154,800 and the G5 workers (the row edits) 2026-10-05 22:49:06 +00:00
igneum-josh
c0610b0366 Counter ASIC 2.0: N4 = N5 = 154,800 and the G5 workers in the rollout plan; status 22:48 2026-10-05 22:48:57 +00:00
igneum-josh
107c3d0646 Counter ASIC 2.0 status 22:48: C35, Ember's re-run held, the AMD link flapping 2026-10-05 22:48:05 +00:00
igneum-josh
90da6e63c2 Counter ASIC 2.0 status 22:45: the shipper's takeover and CI fixes, the PC queues for the rollout 2026-10-05 22:45:24 +00:00
igneum-josh
6e1f047af9 Counter ASIC 2.0 status 22:44: the AMD agent stopped, PC 1 clear for the update 2026-10-05 22:44:17 +00:00
igneum-josh
4f3193a463 Counter ASIC 2.0 status 22:43: Ember's failed run, the PC 1 window for the AMD sweep, the update holds 2026-10-05 22:43:50 +00:00
igneum-josh
1336b4de22 Counter ASIC 2.0 status 22:42: the release tree handed to the shipper 2026-10-05 22:42:12 +00:00
igneum-josh
d3a3641629 Counter ASIC 3.0 plan from the history audit; status 22:41: the release tree assembled, the 12.7 GB floor, PC 2 queue 2026-10-05 22:41:24 +00:00
igneum-josh
57844e90c9 C34: the packaged override line carries all nine fields (N4, N5 and the three proving v1 parameters); the two digests at publish 2026-10-05 22:39:44 +00:00
igneum-josh
acec0a173a Counter ASIC 2.0 status 22:38: the merged tip fa3c932, the 0.3.11 ship assigned with its inputs 2026-10-05 22:38:33 +00:00
igneum-josh
076c0ab9c1 Counter ASIC 2.0: H at about 18:45Z, the G4b row's state text, the floor build green and the sweep go; status 22:33 2026-10-05 22:33:42 +00:00
igneum-josh
430f66aa4e Counter ASIC 2.0: gate G4b green (the Metal miner across a v3 boundary; the serveDataset outage fixed); status 22:33 2026-10-05 22:33:15 +00:00
igneum-josh
9ade96f4b5 Counter ASIC 2.0: C32 rules (PC 2's update-now after the floor build; re-fetch after every app update); status 22:32 2026-10-05 22:32:44 +00:00
igneum-josh
f9a8d0c998 Counter ASIC 2.0 status 22:30: C31, Ember's run, floor-build-3 2026-10-05 22:30:56 +00:00
igneum-josh
a7be43f95d C31: the litepaper's 12 GB clause struck, the dataset schedule written as the gate 1 proposal on the site and litepaper, the merge rule for evidence row 16 and the proving sentences 2026-10-05 22:30:41 +00:00
igneum-josh
dadbcf42f4 C1: H = 210,000 lands about 19:00Z on 6 October (18:50 to 19:35), not 19:50 2026-10-05 22:27:36 +00:00
igneum-josh
d73894218e Counter ASIC 2.0 status 22:27: the integration merge plan and the ship order 2026-10-05 22:27:04 +00:00
igneum-josh
f4e57d2fde Counter ASIC 2.0: the fourth eGPU drop in the hardware events, the era branch final, PC 1 to Ember; status 22:25 2026-10-05 22:25:24 +00:00
igneum-josh
7e6f77c8f9 C29 and D11: the verifier line on the fixed crate, the bounty struck until escrowed, the final-class rates in the public tables; status 22:25 2026-10-05 22:25:02 +00:00
igneum-josh
608d74a1e4 Counter ASIC 2.0: gates G1 and G2 green on the final class; spec 1.17 fingerprints; status 22:24 2026-10-05 22:24:19 +00:00
igneum-josh
6ada41fe31 Counter ASIC 2.0 status 22:23: floor-build-1 failed on its log path, floor-build-2 running 2026-10-05 22:23:46 +00:00
igneum-josh
033c4f310a Counter ASIC 2.0: G4b (a) done, app e0de2ab; status 22:23 2026-10-05 22:23:07 +00:00
igneum-josh
ac9f978c4b Counter ASIC 2.0: gate G4b (the Mac mines v3: the app's --prepare-packs gap and the Metal gate run); status 22:21 2026-10-05 22:21:57 +00:00
igneum-josh
32f4ddd3fa Counter ASIC 2.0: gate G4 run 3 green on the final class; status 22:20 2026-10-05 22:20:42 +00:00
igneum-josh
8e65696ce9 Litepaper: the verifier figures on class v3; status 22:20 2026-10-05 22:20:18 +00:00
igneum-josh
00f0fae4ca Counter ASIC 2.0 status 22:19: proving-methods recorded 2026-10-05 22:19:18 +00:00
igneum-josh
cabec3b8bb Site and litepaper: level 1 on the hero and abstract, the chip bullet on the measured row; the level 3 table filled; status 22:18 2026-10-05 22:18:39 +00:00
igneum-josh
dc9cbfdd8d Counter ASIC 2.0: gate G6 green; status 22:16 2026-10-05 22:16:50 +00:00
igneum-josh
b874b8a9b9 Counter ASIC 2.0 status 22:16: the 5090 power sweep, the G2 job go 2026-10-05 22:16:15 +00:00
igneum-josh
357fa52494 Counter ASIC 2.0: the final-vectors package, the bash-body-check branch in the 0.3.11 tree; status 22:15 2026-10-05 22:15:07 +00:00
igneum-josh
9881c885d1 Counter ASIC 2.0 status 22:13: suite job 4 published on the final tree 2026-10-05 22:13:25 +00:00
igneum-josh
684aa510f2 Counter ASIC 2.0: the verifier fix and the x8 class committed; status 22:11 2026-10-05 22:11:49 +00:00
igneum-josh
26fedaf7f7 Counter ASIC 2.0 status 22:11: the toolchain check, the build held behind job 4, C26 and C27 2026-10-05 22:11:10 +00:00
igneum-josh
45f7c2e919 Counter ASIC 2.0 status 22:09: the fork test fixed at 89dfcb95 2026-10-05 22:09:59 +00:00
igneum-josh
dbe94761f2 Counter ASIC 2.0: G6 job 3 failed on a stale fork test, job 4 on the final tree; status 22:08 2026-10-05 22:08:07 +00:00
igneum-josh
aa977932eb Counter ASIC 2.0: mixer x8 decided into v3 on the PC build rows; status 22:06 2026-10-05 22:06:59 +00:00
igneum-josh
5f05b89f9a Counter ASIC 2.0 status 22:03: the PC 2 prover back, suite job 3 published 2026-10-05 22:03:35 +00:00
igneum-josh
c8d6580b77 Counter ASIC 2.0 status 22:01: the regression bisected, the mixer PC job, the PC 2 queue, the ship template 2026-10-05 22:01:10 +00:00
igneum-josh
0ed93c77fb Counter ASIC 2.0: G6 job 2 green; the master merge dry-run; status 22:00 2026-10-05 22:00:30 +00:00
igneum-josh
668e43a651 Counter ASIC 2.0 status 21:59: 0.3.10 shipped and merged, the 0.3.11 base is master cde561c 2026-10-05 21:59:55 +00:00
igneum-josh
cc1ace9d08 Counter ASIC 2.0 status 21:58: ca2-v3 fbf958e with the cache merged 2026-10-05 21:58:53 +00:00
igneum-josh
b9d2279637 Counter ASIC 2.0: layers 4 and 8 decided IN on the PC rows; status 21:58 2026-10-05 21:58:33 +00:00
igneum-josh
77948e3869 Counter ASIC 2.0 status 21:58: ca2-cache rebased 1950661 2026-10-05 21:58:03 +00:00
igneum-josh
5b7dfe9ae3 Counter ASIC 2.0 status 21:57: the era PC job, the verifier regression gate item, the PC 2 order 2026-10-05 21:57:48 +00:00
igneum-josh
da2841b15d Counter ASIC 2.0: G6 first job failed on the known kaspa-consensus flake, split re-run; the app branch final a223ca9; status 21:56 2026-10-05 21:56:54 +00:00
igneum-josh
25ffa15cf2 Counter ASIC 2.0 status 21:55: both PCs on 0.3.10, the PC 2 prover socket item, ca2-v3 63dabb2 2026-10-05 21:55:39 +00:00
igneum-josh
18a8d9941c Counter ASIC 2.0 status 21:53: the suite job published 2026-10-05 21:53:24 +00:00
igneum-josh
6bb6b67f57 Counter ASIC 2.0: gate G4 green (runs 1 and 2); status 21:52: the suites packing 2026-10-05 21:52:11 +00:00
igneum-josh
10fa3b1b09 Counter ASIC 2.0: the resume fix assigned to 0.3.11's app half; status 21:50 2026-10-05 21:50:54 +00:00