Commit graph

2 commits

Author SHA1 Message Date
igneum-labs
a484e7bcfc Plan cryptanalysis: the floor is DAA 831,600 (a week past publish 2), so the start to quote is 15 October 2026, 09:00 UK, never 14; the payer entity is the project lead's to confirm
The flip comes by signal at the first epoch boundary after a one-day window carries 95 percent (earliest about 00:45 UK on 8 October) or at the floor on 14 October; the week of class v4 hash closes about 00:45 UK on 15 October at the earliest (Friday 16 if the window needs a second day, 21 October if the flip waits for the floor). Section 5.2 and the one page: Igneum Labs LTD (DIFC) as payer is taken from the litepaper and the ledger decisions; its existence, name and standing are confirmed by the project lead before any email goes.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 23:31:44 +00:00
igneum-labs
ff8ee680f8 Plan: the outside cryptanalysis of the hash class (scope, shortlist, shape, timing, budget, outreach draft)
docs/plans/cryptanalysis.md: the project lead's 6 October 2026 decision (an outside team attacks class v4 after a week of real hash, bounded at USD 80,000 to 160,000) as a procurement plan. Scope over the generator, the mixer and chain, the latency-shadow ladder, the verifier bound, the era draw, the chip model's inputs and an ASIC and FPGA cost estimate; finality and the proof system out. Three fixed-price lots (firm, academic group, ASIC house), the prize question stated against the NO device bounty rule for the project lead to decide, everything published whole. Eight fits with comparable engagements, bases, contact pages and precedent prices (the four RandomX audits, ProgPoW, Zcash, Grin; the Antminer X9 as the lesson). Flip after publish 2 at 00:43 UK on 7 October; earliest start 14 or 15 October 2026, 09:00 UK; the freeze list. Three price points. A pseudonymous outreach email for approval. No contact made.

Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
2026-10-06 23:29:56 +00:00