Counter ASIC 2.0 status 21:46: PC 1 on 0.3.10, the era go
This commit is contained in:
parent
9e76dc73d0
commit
ceb769b685
1 changed files with 4 additions and 0 deletions
|
|
@ -414,3 +414,7 @@ ca2-era 9f98af2 (one commit on ca2-v3 HEAD; 48 lib + 17 integration tests; the p
|
|||
21:42. ca2-v3 now carries the era draw: ca2-era's tip b105a55 (9f98af2 rebased onto the node agent's 88dafbc) fast-forwarded, no conflict; the suite job's main-repo tip is b105a55. ca2-cache 2de19e5 does NOT merge (it bases on 464d6e1, before the mixer and era commits rewrote the class literal, the load emitters, the pack fields and the pinned-pack tests: 8 files, 35 hunks); the node agent aborted cleanly and the cache agent is rebasing onto b105a55 as a squashed commit with hot: None kept; the composed class under test is unchanged by the cache code, so the igneum-pow and packfile checks, the igneumd and igneum-miner rebuild and gate run 2 proceed on b105a55 now.
|
||||
|
||||
21:45. PC 2 defect: since a job's /api/resume at 21:25:11Z the 0.3.9 app answered ok and never restarted the NVIDIA miner (nor the iGPU one): the 5090 worker "off" at hash 0 holding 1.7 GB, so agg-cost-pc2-2's mining phases are void (its idle phases run; closes about 21:52Z) and the devnet has been short PC 2's rate since 21:25. The 0.3.10 restart should bring the miners back; the shipper confirms PC 2's 5090 STATUS rate after the 0.3.10 line, else the aggregation-cost agent's restore script (tools/proving-v1/pc2-agg-cost-restore.ps1, 30 s) runs. Defect for the next cut: a resume that answers ok without a miner restart; the app must re-check the miner processes after a resume and report a failure. The aggregation-cost agent gets a 20-minute re-run slot on PC 2 after the 0.3.11 suites.
|
||||
|
||||
## 21:46 PC 1 is on 0.3.10; the era job has the go
|
||||
|
||||
PC 1 restarted on 0.3.10 at 21:40:41Z (engine run win-ae432dc7-20261005-214041), the 5090 at 141.4 MH/s by 21:45:17Z; "go PC 1" to the era job at 21:46 (fetch-ca2-era-20261005, zip f79c0607...; the 5090 then the AMD card; 6 to 10 min). The mixer daily-build job follows it, then the 5090 power sweep, Ember's build and fetches, the repro re-run, the AMD sweep (conditional), Ember's run. PC 2 is still on 0.3.9 at 21:45 (its restart pending); the 0.3.11 suites publish after its 0.3.10 line and a confirmed 5090 rate. Every measurement before the restart on PC 1 (hot table 21:29 to 21:35) stands: it did not straddle.
|
||||
|
|
|
|||
Loading…
Reference in a new issue