diff --git a/docs/plans/counter-asic-3-status.md b/docs/plans/counter-asic-3-status.md index 2126e8f5f..c1d6b9ec8 100644 --- a/docs/plans/counter-asic-3-status.md +++ b/docs/plans/counter-asic-3-status.md @@ -18,7 +18,7 @@ The test every result is judged against (the project lead, 6 October): a chip ma |---|---|---|---|---| | 1 | Partial-store chip and the time-memory curve | ca3-analysis | CLOSED, merged (71df794) | verdict OVER 2x: the f = 1 chip (the dataset stored in DRAM, nothing recomputed) is 5.1x per joule on GDDR7 and 7.5x to 9.2x on HBM3 in the model, 2.1x to 4.8x by the Ethash precedent, $2.8 per MH/s against the 5090's $14.7; the curve is monotone toward f = 1, so the partial-store chip is never built; the mixer and item 2 do not touch it; chip-model-v3.md section 5 | | 2 | Per-day item-derivation program (reserve entry, verifier gate, daily build) | ca3-derive | running (Mac first; 5090 job after PC 2 clears) | | -| 4 + 5 | Share-pattern detector, trigger rules, FPGA lane, layer 9 against 7 | ca3-detector | running | | +| 4 + 5 | Share-pattern detector, trigger rules, FPGA lane, layer 9 against 7 | ca3-detector | CLOSED, merged (c0642af, merge ed06814) | detector.mjs + 7 of 7 tests + one observer hook, dry run quiet on the devnet (max correlation 0.53 against the 0.8 edge; excess spread 0 to 5.2 percent); funding.md rule 5: bounty escrowed and benchmark live before daily issuance crosses USD 20,000 a day; epoch-length.md sections 11 and 12: signal trigger M = 6 windows; FPGA soft overlay 0.30x to 0.39x per watt on the measured basis, 0.7x to 1.9x at the bank-bound ceiling (unmeasured); layer 9 ranks above layer 7. The live observer is NOT restarted yet: the write path is untested; one restart after item 7's hook merges, then the first live detector row is recorded here | | 3 | Cryptanalysis brief in funding.md | ca3-crypto-brief | CLOSED, merged (43c3ead) | funding.md line item USD 80k to 160k, reviewer shortlist, ranked break list; verdict GO to commission (no outreach, no spend) | | 6 + 7 | Reserve order with step costs, vendor-share metric | ca3-reserve | running (Mac first; 5090 job after PC 2 clears) | | | 8 (added by item 1's finding, coordinator 08:xx UTC) | Program work in the latency shadow: the hash rate, watts and verifier cost at N = 50,000, 100,000, 200,000 ops per hash on the M5 Max and the 5090; the 5090 power-cap rows | ca3-shadow | running (Mac first; 5090 job after PC 2 clears) | | @@ -89,4 +89,10 @@ Either replaces "under 2x" on the site and in the litepaper once the project lea ## 7. Unverified and owed -(filled at the close) +| Item | Owed | Why | +|---|---|---| +| 1 | the 5090's watts at the hash alone and under a cap (Ember Tune rows requested; the 5 October PC 2 sweep as the second source); every DRAM energy figure is a streaming figure applied to random reads; the 9070 XT rows | PC 1 not released; no chip measured | +| 4 | the 9070 XT rate band for the detector; the coinbase card-model tag (0.3.12) so the chain-attributed band needs no fleet log; the public testnet's first-week baseline (history check 2) | PC 1 not released; a miner change | +| 5 | a rented FPGA hour (the soft-overlay reads-in-flight number is a model on cited HBM figures) | no FPGA in the fleet | +| 6 | the 9070 XT step costs | PC 1 not released | +| 4 + 7 | the live observer restart with both hooks, and the first live detector and vendor-share rows | after item 7 merges |