Consequences ledger: the branch's merge note for the integrator
Co-Authored-By: Claude Fable 5.1 <noreply@anthropic.com>
This commit is contained in:
parent
78acb4984d
commit
74254bcdc4
1 changed files with 2 additions and 0 deletions
|
|
@ -65,3 +65,5 @@ Sweep 8a (22:2x UTC) note: `docs/analysis/proving-methods.md` (branch proving-me
|
|||
| C30 | The 5090 mines in the app at 115.4 MH/s (the power sweep, 22:09 to 22:15Z, hash from the app's API) against 136 to 137 MH/s at device time in every bench row tonight, with the cap not binding (draw 316 W under a 431 W cap, SM at 3,051 MHz) | bench-log e304458; read-width and mixer PC rows | every 5090 owner on the app (and every big card: the gap is the app's job loop, not the kernel) | About 15% of a 5090's hash is lost between the kernel and the app, and the sweep entry explains it away as API sampling. M11 measured the 9070 XT at the app's 2^21 job size equal to its 2^24 rate, but no 5090 row exists at 2^21; the 5090 finishes a 2^21 job in about 15 ms, so per-job launch, read-back and template work can cost that much. The STATUS line prints "wall" and "inside jobs" rates and would show it | One measurement on PC 1: `igneum-worker-cuda --bench` on the live pack at --batch-log2 21 and 24 on the 5090, and the 5090's STATUS wall-against-inside gap over 10 minutes; if the job size is the cause, the app's job size for cards over 100 MH/s rises (2^22 or 2^23) in the next cut: a 15% gain for every 5090 owner | repro-bench agent a0b9f574775ef1693 (its PC 1 slot); coordinator | taken (repro-bench agent: --bench at 2^21 and 2^24 on the 5090 on the genesis pack and the live pack in its PC 1 slot, then PC 2; the STATUS wall-against-inside gap from the 10 minutes before and after its window; the consequence written either way) |
|
||||
|
||||
Sweep 9 (22:2x UTC) notes: the devnet at 22:24:31Z reads DAA 136,578, 0.909 blocks/s measured over the stats window and 1.005 DAA/s averaged since the fee-switch plan's 15:40Z read (112,227), so H = 210,000 lands between about 18:50 and 19:35 UTC on 6 October, up to an hour EARLIER than the 19:50Z written in fee-switch-devnet.md, the rollout plan 7a and release-0.3.10.md; the 16:00Z check (D1) keeps about 2.8 hours of margin and stands; the plans' ETA is re-cut in D1 and sent to the coordinator. Gates tonight: G3, G4, G6 green on the final class (x8 + era); G4b added (the Mac app passes --prepare-packs only to non-Metal workers, so every Mac would stop at the first v3 epoch: found by the node agent, the fix with a unit test and a real Metal gate run before the ship); G1 and G2 on the PC 1 job since 22:16.
|
||||
|
||||
Merge note for the integrator (22:3x UTC): branch `consequences` is docs/plans/consequences-2026-10-05.md and consequences-decisions.md only (base ca8d9f3); a merge-tree against master cde561c and after shows 0 conflicts.
|
||||
|
|
|
|||
Loading…
Reference in a new issue