diff --git a/docs/plans/counter-asic-2-status.md b/docs/plans/counter-asic-2-status.md index 3b6c2af1e..e5f1284ee 100644 --- a/docs/plans/counter-asic-2-status.md +++ b/docs/plans/counter-asic-2-status.md @@ -579,3 +579,5 @@ PC 2: floor-sweep-1 (22:34 to 22:37:55Z, every proof verified by the unpatched h ## 22:42 the release tree is handed to the shipper; the ship runs Checks on the merge tip b968ee0 on the Mac: igneum-pow 53 + 4 + 19 + 7, the app 113 + 27 + 8, 0 failed (the OpenCL generic test wants the NVRTC emulator run first; both ran green on the same code at 49c7e78). The coordinator told the shipper directly to ship; it has the tree (its version bump 21173c4 sits on b968ee0 in /Users/joshm/Projects/igneum-wt-ship0311) and I touch nothing in it from here. Handoff message sent with the tip, the fork worktree (vendor/igneum-node-0311 at 89dfcb95), the nine-field override line, the two digests and the machine order (PC 2 last, after the aggregation-cost re-run closing about 23:02 and the prover-floor agent's build 4 and sweep 2 on the v2 patch eda49ab: every trace buffer sized to its padded need, the recursion keys 0.75 to about 0.21 GB each). The shipper reports to the coordinator and me at each step; the node and proving agents stand by. + +22:43. PC 1: Ember's tune run (ember-tune-pc1-1) failed at 22:31:06Z after 47 s (the second engine exited at once; no knob touched: the 5090 at its 450 W limit, 2,850 MHz; the 9070 XT present on bus 98 at factory); a collect job reads the exit reason; Ember's re-run comes after PC 1's 0.3.11 update with its fetches republished (C32). Finding from its probe: the AMD helper's gmax range is an offset (-500 to 1000), not MHz; the probe is fixed to keep the clock knob closed on offset ranges and bound the power ladder by plimit_range. The window before PC 1's update goes to the AMD sweep (a fresh kit fetch, the two-read probe, 26 minutes if the card is present); the shipper holds PC 1's update-now until "PC 1 clear" (and PC 2's until "PC 2 clear"); the Mac and the laptop update first. PC 2: the aggregation-cost re-run (to about 23:02), then floor-build-4 and floor-sweep-2.