Merge master-pin-0320 b9b37480 into master (gate: green on b9b37480, recorded by tools/ci/pre-push.sh; the full gate runs in CI on this merge)
This commit is contained in:
commit
4b4e1bc12f
2 changed files with 2 additions and 1 deletions
|
|
@ -18,3 +18,4 @@ Every cut of the Igneum Miner app and its node runs under these. The dated plan
|
|||
11. **Kill by pid, never by name,** on the shared Mac; a merge worktree never checks out master.
|
||||
12. **The Discord card only when every platform is live.** Live manifest changes beyond the binaries (a moved consensus floor) go out only on the project lead's explicit word, staged beside the release with their digest and a one-line diff.
|
||||
13. **Ship on green:** no calendar waits; when the gates are green, publish and state the clock time (UK). Checkpoints are for slips, not for waiting.
|
||||
14. **Master is re-pinned at every publish (main, 7 October 2026).** packaging/windows/node-source.pin on master names the node commit of the published payload-inputs.json; a publish that moves the pin re-pins master through merge-to-master.sh in the same hour, or master's windows-ci reads red at its "payload inputs" step on every run (6 to 7 October: four red runs on the stale pin). The pin check is a named line in the cut list.
|
||||
|
|
|
|||
|
|
@ -1 +1 @@
|
|||
4c6b129d75c3d77a3689d22f1e1dc721b556aebb
|
||||
c4459193ff5ada38df21f900c91026d3f07c963f
|
||||
|
|
|
|||
Loading…
Reference in a new issue