diff --git a/docs/plans/consequences-2026-10-05.md b/docs/plans/consequences-2026-10-05.md index 6897c45e4..fd6c4a4a2 100644 --- a/docs/plans/consequences-2026-10-05.md +++ b/docs/plans/consequences-2026-10-05.md @@ -69,3 +69,4 @@ Sweep 9 (22:2x UTC) notes: the devnet at 22:24:31Z reads DAA 136,578, 0.909 bloc Merge note for the integrator (22:3x UTC): branch `consequences` is docs/plans/consequences-2026-10-05.md and consequences-decisions.md only (base ca8d9f3); a merge-tree against master cde561c and after shows 0 conflicts. | C31 | The copy the ship takes (ca2-coord at 22:3x): litepaper line 562 "12 GB or more proves full shards" beside line 452 "Proving needs an NVIDIA card with 24 GB or more"; evidence row 16 still "A 12 GB card proves one shard in about 20 s, designed" while proving-v1 440fd59 withdrew it; line 562 states the dataset "doubles on a step schedule fixed at genesis (years 4, 12 and 28)" | ca2-coord site/litepaper.html 452 and 562, docs/evidence.md 43; proving-v1 440fd59; D4 | every reader of the litepaper; the integrator; the project lead's D4 | One page says 12 GB and 24 GB for the same thing; the evidence table on the ship branch contradicts the measurement, and the two branches will conflict on evidence.md and litepaper.html at the merge (ship order: ca2-coord before proving-v1), so the stale row can win by accident; and the step schedule is written as a genesis fact while the coordinator's own 22:50 entry calls mapping (b) a recommendation for the project lead (gate 1, D4): a public page should not decide a genesis parameter before he does | On ca2-coord: strike "12 GB or more proves full shards" from line 562 (line 452 is the sentence); take proving-v1's evidence row 16 (WITHDRAWN, 24 GB measured) at the merge and say so in the merge plan; write the growth sentence as the recommendation it is ("the plan is a step schedule ... decided at gate 1") until D4 is taken | coordinator ada8afb62d752b1e2 | closed on ca2-coord a7be43f and 0d9b23d (the 12 GB clause struck; the merge rule "take proving-v1's row 16 and its proving sentences" in the rollout plan; one wording in all five places, "the proposed schedule, fixed at the testnet genesis: 2 GB, doubling at years 4, 12 and 28", the lifetime sentences kept as consequences of the proposal and marked approximate) | | C32 | The 0.3.10 install at 21:49Z cleared PC 1's app jobs folder and with it the AMD kit fetched at 21:23:59Z; the amd-card-test playbook now says its fetch must be republished after any app update | bench-log 39f02ff; status 21:05 ("the jobs folder is cleared by fetch jobs" was the earlier, wrong reading) | every PC job tonight and tomorrow; the 0.3.11 rollout | A class, not one playbook: every fetch-then-run pair (era, hot table, mixer, repro, Ember, the AMD sweep, the prover-floor build) loses its kit when an update lands between the fetch and the run, and the run fails in seconds or, worse, runs against a stale copy. The 0.3.11 update-now reaches PC 2 while the prover-floor agent's 60 to 90 minute server build runs there (go at 22:17, to about 23:50): if that build's working directory is under the app's jobs folder, the update wipes it mid-build and the 12 GB rows slip past the morning | (1) The 0.3.11 update-now is sequenced after the prover-floor build closes, or the build's directory is confirmed outside the jobs folder before the ship; (2) every run playbook begins with a presence check of its kit and fails with "kit missing: republish the fetch after the app update" (the class check: the bash-body sub-agent's CI check gains a rule that a run job naming a kit path tests it first, or the coordinator's queue re-fetches after every update as a rule) | coordinator ada8afb62d752b1e2 (the queue and the ship order) | taken (coordinator: the prover-floor build lives under /opt/igneum-floor in WSL2, outside the jobs folder, but it is the app's job process and an app restart ends it, so the 0.3.11 update-now goes to PC 2 only after floor-build-3 closes, the ship's earlier steps not waiting; the re-fetch rule and the presence-check rule are in the rollout plan beside the one-job rule, the playbook owners carry it at their next publish; the CI side is with the bash-body sub-agent as a kit-path check) | +| C33 | `/api/live` at 22:33Z: 13 of 482 blocks fully proven in 10 minutes (2.7%), 1 prover, median proof lag 46 s, the live node's verifier "Off" with 42 pool entries pending and 0 verified; `/api/stats` (the documented public API) carries no proving field at all | live and stats handlers (`site/api/stats.mjs` FIELDS; the explorer branch 3e01212); the homepage "~60 s to a proof"; evidence row 15 | everyone who reads the public API or the homepage tile; the testnet's first external reader | The public stats API hides the one number that qualifies the tile and row 15: coverage is 2.7% with one prover, and the proof lag is 46 s. A reader can find it only on /api/live. The live node's verifier "Off" (42 pending, 0 verified) is the Mac app node in trust mode or without a host, so the page says "verifier Off" while the chain pays provers: a public-page oddity the morning reader will ask about | `/api/stats` gains a `proving` object from the same live_state (`blocks_10m`, `blocks_fully_proven_10m`, `shards_paid_10m`, `provers_10m`, `median_proof_lag_s`, `active`), documented in docs/api/public-stats.md and in its contract test; the live page's verifier line names which node it reads and why it is off; the homepage tile's "~60 s" caption cites the measured 46 s median and the 2.7% coverage ("the target; today one prover covers 2.7% of blocks at a 46 s median") | explorer a76f60b415859b7b5 (the API); the tile caption: D2 wording for the project lead | sent |