Counter ASIC 2.0 status 22:30: C31, Ember's run, floor-build-3

This commit is contained in:
igneum-labs 2026-10-05 22:30:56 +00:00
parent de77871a84
commit 1bec7efddf

View file

@ -551,3 +551,5 @@ The 9070 XT is absent again at 22:24:09Z (relay probe #230: no Sonnet or USB4 ro
## 22:27 the integration merge, in the node agent's hands; the ship order
A dry run of ca2-v3 into master in a scratch worktree conflicts in docs/bench-log.md (append-only, both kept) and proto-opencl/host.c, where taking ca2-v3's side would drop master's 0.3.10 hunks (the PCI topology and duplicate-platform detection, the select read-back): it must be resolved by hand keeping both. ca2-v3 also lacks readwidth's last three commits (d0018cf the OpenCL scratch local-buffer rule, e752fc7 read-width.md and the overflow fix, 30ff674 the per-watt rows). So the node agent, as ca2-v3's owner, merges readwidth 30ff674 and origin/master (cde561c, 1f0d62c) into ca2-v3 beside gate run 4, re-runs the igneum-pow suite, the packfile test, test-generic.sh on Apple OpenCL and the fork check, and sends the tip. ca2-coord (docs, spec, site, evidence, the plans) stays on its a9e002c base: its code files are untouched readwidth copies, so its merge onto that tip takes ca2-v3's code and brings only the documents (a rebase attempt replayed readwidth's own commits and was aborted). Ship order: master <- ca2-v3' <- ca2-coord <- the tooling and analysis branches (consequences, bash-body-check, amd-prove, card-lifetime, proving-methods, asic-history when it lands), the app branch proving-v1 e0de2ab (on 5b0d54f, in master), the fork ca2-v3-node 89dfcb95 (on 21d4c73c, release-0.3.10's tip). The ASIC-history agent (a202a09dcd24ba1d3) resumed at 22:52 (its clock) in ../igneum-wt-asic-history; its ranked additions are Counter ASIC 3.0's input after the publish.
22:30. C31 applied (a7be43f): the litepaper's "12 GB or more proves full shards" struck (one page, one number: 24 GB); the dataset's step schedule written as the gate 1 proposal on the site and litepaper (D4 is the project lead's); the merge rule "take proving-v1's evidence row 16 and its proving sentences" in the rollout plan. PC 1: Ember's build done (build-20261005-222558, 97 s, 6 outputs verified), its tune run on the 5090 has the go. PC 2: floor-build-3 (with the pinned Go toolchain; builds 1 and 2 failed on a missing go, the first unreported by a log-path bug) runs, 25 to 45 minutes expected.